recommend Pressure vessel What is it? Pressure vessel manufactor What can I do? We often hear that pump stations have many uses, and are dazzled by various articles. It seems that the more we understand them, the more difficult it is to understand them. Then we will talk about some introductions of pump stations and what they can do. First of all, the pump station looks ordinary to us. Its exterior is dark green glass fiber reinforced plastic cylinder, which seems very simple, but it is not. In fact, the internal structure of the pump station can be very complex and diverse. In the dark green shell of the integrated pump station, there are many parts and components. The core of the pump station we are talking about is the water pump. For pump stations of some sizes, there is not only one water pump, but basically all of them are from the water pump unit. As for the model selection of the pump, the previous articles have also talked about it, so I will not say much here.
![Recommended pressure vessel manufacturer in Lianyungang](/data/upload/202008/20200813105920_115.jpg)
Compared with traditional pump stations, Pressure vessel manufactor The required installation and commissioning time is greatly reduced. recommend Pressure vessel The existing integrated sewage pump station is technically improved, and private customization is provided. In addition, why is the price of qualified fire pump not expensive? The correct fire pump manufacturers, especially those with full qualifications and years of experience, are first of all professional enough in production technology. The working procedures of the system machine, submersible sewage pump and other main control equipment are fed into the PLC machine to achieve automatic operation, so as to reduce the operating workload and reduce unnecessary human damage. The ground occupies only a few square meters, so space is saved. Precautions when selecting comprehensive sewage pump station, remember! The sewage comprehensive pump station has a great impact on sewage treatment, and is a favorite sewage treatment product of many units and enterprises.
![Recommended pressure vessel manufacturer in Lianyungang](/data/upload/202008/20200813105918_674.jpg)
recommend Pressure vessel How to choose? Pressure vessel manufactor The main equipment in the pump station selected according to the input and output are: various controllable valves, pump sets, grid systems, water level gauges, flow meters, etc. According to the requirements of the system and the different control methods adopted, as well as the nature, parameters and characteristics of the input and output signals, the appropriate PLC system can be flexibly selected. Select according to the storage capacity Calculate the actual capacity demand of the storage according to the number of nodes required for programming. The PLC control system used in the current pump station is selected according to the communication requirements, which is generally divided into equipment unit layer, pump station layer, dispatching layer, etc. Layers directly need to transmit various parameter information, so we should select the appropriate PLC equipment according to the field needs, such as network, expansion, off the shelf bus connection, investment and our own equipment.
![Recommended pressure vessel manufacturer in Lianyungang](/data/upload/202008/20200813105921_741.jpg)
recommend Pressure vessel What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Pressure vessel manufactor Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.