recommend Fire fighting integrated pump set Operation and maintenance of the lifting pump station: 1. The operation management mode of the comprehensive sewage pump station includes the self management of the construction unit, the agent management of the equipment supplier, the centralized entrusted operation, and the self management of farmers. The appropriate mode can be selected according to the specific situation. 2. The design or construction unit of the sewage lift pump station shall train the operation management personnel after the completion acceptance and before the formal delivery of the project, and timely deliver the construction data and system operation management requirements together. 3. The operation and management personnel of the integrated pump station shall be familiar with the operation requirements, technical indicators and safe operation procedures of the treatment process, facilities and equipment, etc., patrol and inspect the operation of the sewage treatment facilities as required, and make operation records in a timely manner. 4. The operation management personnel of the pump station shall regularly maintain, check and clean the relevant equipment to prevent equipment failures and ensure the normal operation of the facilities. five Fire fighting integrated pump set manufactor Timely master the water quality of the treatment system to ensure that the water quality meets the standard; If the water quality is not up to the standard, find and solve the problem in time.
recommend Fire fighting integrated pump set What is it? Fire fighting integrated pump set manufactor What can I do? We often hear that pump stations have many uses, and are dazzled by various articles. It seems that the more we understand them, the more difficult it is to understand them. Then we will talk about some introductions of pump stations and what they can do. First of all, the pump station looks ordinary to us. Its exterior is dark green glass fiber reinforced plastic cylinder, which seems very simple, but it is not. In fact, the internal structure of the pump station can be very complex and diverse. In the dark green shell of the integrated pump station, there are many parts and components. The core of the pump station we are talking about is the water pump. For pump stations of some sizes, there is not only one water pump, but basically all of them are from the water pump unit. As for the model selection of the pump, the previous articles have also talked about it, so I will not say much here.
recommend Fire fighting integrated pump set What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Fire fighting integrated pump set manufactor Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.
1. To ensure the safety of the pump room, the pump room must be locked. 2、 Fire fighting integrated pump set manufactor Safety Operation Regulations, Hygiene and Safety Management System for Secondary Water Supply, Patrol Inspection Specifications, Water Quality Inspection Record System must be posted inside. 3 recommend Fire fighting integrated pump set There must be the following record documents inside: Patrol Inspection Record, Water Tank Blowdown Record, Disinfection Record, Water Quality Inspection Record. 4. The pump room must be marked with the pressurized area, and the corresponding control system should also be marked with the pressurized area: low area, middle area, high area, etc, Mark the product model, qualified number, ex factory date, etc. 6. Water pump identification: the number of pumps must be painted on each pump; For example: 1 # pump, 2 # pump, 3 # pump, 4 # pump, 5 # pump, words. 7. "Normally open" signboard of inlet and outlet valves; 8. The pipe shall be marked with water flow direction arrow; 9. The prefabricated energy-saving pump room needs a drainage system 10. The energy-saving pump room can realize on-site control and remote monitoring;