large Vertical energy-saving centrifugal pump What is it? Vertical energy-saving centrifugal pump Manufacturer What can I do? We often hear that pump stations have many uses, and are dazzled by various articles. It seems that the more we understand them, the more difficult it is to understand them. Then we will talk about some introductions of pump stations and what they can do. First of all, the pump station looks ordinary to us. Its exterior is dark green glass fiber reinforced plastic cylinder, which seems very simple, but it is not. In fact, the internal structure of the pump station can be very complex and diverse. In the dark green shell of the integrated pump station, there are many parts and components. The core of the pump station we are talking about is the water pump. For pump stations of some sizes, there is not only one water pump, but basically all of them are from the water pump unit. As for the model selection of the pump, the previous articles have also talked about it, so I will not say much here.
Compared with traditional pump stations, Vertical energy-saving centrifugal pump Manufacturer The required installation and commissioning time is greatly reduced. large Vertical energy-saving centrifugal pump The existing integrated sewage pump station is technically improved, and private customization is provided. In addition, why is the price of qualified fire pump not expensive? The correct fire pump manufacturers, especially those with full qualifications and years of experience, are first of all professional enough in production technology. The working procedures of the system machine, submersible sewage pump and other main control equipment are fed into the PLC machine to achieve automatic operation, so as to reduce the operating workload and reduce unnecessary human damage. The ground occupies only a few square meters, so space is saved. Precautions when selecting comprehensive sewage pump station, remember! The sewage comprehensive pump station has a great impact on sewage treatment, and is a favorite sewage treatment product of many units and enterprises.
large Vertical energy-saving centrifugal pump While making outstanding contributions to sewage collection and treatment and flood control and waterlogging drainage, it also has many defects, such as large floor area, high cost, and easy to produce methane volatilization to pollute the environment. But with the upgrading of technology, Vertical energy-saving centrifugal pump Manufacturer According to the market demand, we have developed and produced an integrated prefabricated pump station with more optimized performance, which has solved many disadvantages of the concrete pump station and replaced the traditional concrete pump station as the current mainstream pump station.
large Vertical energy-saving centrifugal pump What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Vertical energy-saving centrifugal pump Manufacturer Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.