recommend Integrated sewage pump set Talking about why the country should vigorously promote smart water, Integrated sewage pump set Price How to build a smart pump house? The four ministries and commissions of the country put forward safeguard measures and requirements on improving and improving the construction and management of secondary water supply infrastructure for urban residents to ensure water quality safety, requiring that the construction and management of secondary water supply infrastructure should be improved and improved in all aspects to ensure the scientific planning and construction of secondary water supply infrastructure and promote the systematic operation and maintenance of secondary water supply infrastructure. Promote the formation of a new pattern of secondary water supply infrastructure construction and management with clear rights and responsibilities, professional management and adequate supervision, and solve the water quality safety problem of "one kilometer after the urban water supply".
Integrated sewage pump set Price General provisions: equipment discharging heat, steam or harmful substances, recommend Integrated sewage pump set Local exhaust should be adopted. When local ventilation can not be used or local ventilation can not meet the health requirements, it shall be supplemented with all-round ventilation or adopt all-round ventilation. The air distribution design shall be optimized according to the characteristics and changes of pollutants, and the normal operation of local exhaust system shall not be damaged. At the same time, when releasing waste heat, moisture and harmful substances, the ventilation volume in all aspects shall be determined according to the large air volume required. When the quantity of harmful substances cannot be determined, the ventilation volume in all aspects can be determined according to the ventilation frequency. All kinds of pump rooms in the domestic sewage treatment station should adopt natural ventilation. When mechanical ventilation is adopted, indoor air should not be recycled. All pump rooms in the oily sewage treatment station should adopt natural ventilation. When mechanical ventilation is adopted, indoor air should not be recycled, and the ventilator and motor should be explosion-proof and directly connected.
recommend Integrated sewage pump set It is not only reflected in its working ability, but also in its excellent manufacturing process and maintenance costs. The integrated prefabricated pump station is highly integrated, so its volume is very small. It is a good choice for sewage treatment equipment for some factories and business districts that do not have a shortage of land. In addition, Integrated sewage pump set Price The degree of intelligence is very high, so its failure rate is very low. Combined with the application of anti blocking technology, the integrated prefabricated pump station becomes very convenient in the later use, which greatly reduces the labor cost and maintenance cost.
recommend Integrated sewage pump set As the underground installation is adopted, it can be directly installed around the residential area, and because of its small floor area, the characteristics of the whole underground installation will not affect the lives of residents. The harmony and unity with the surrounding environment can be achieved through the landscape control room above the ground. Integrated sewage pump set Price It is used in places that cannot rely on gravity to discharge sewage by itself. Waste water below the water level of the waterway is collected through the sewage tank, as well as waste water discharged far away from the municipal sewage pipe network and sanitary facilities, and sewage is transported to the sewage pipe network with the help of the sewage pump.
1. To ensure the safety of the pump room, the pump room must be locked. 2、 Integrated sewage pump set Price Safety Operation Regulations, Hygiene and Safety Management System for Secondary Water Supply, Patrol Inspection Specifications, Water Quality Inspection Record System must be posted inside. 3 recommend Integrated sewage pump set The following record files must be available inside: Patrol Inspection Record, Water Tank Blowdown Record, Disinfection Record, Water Quality Inspection Record. 4. The pump room must have a pressurized area mark, and the corresponding control system should also have a pressurized area mark: low area, middle area, high area, etc, Mark the product model, qualified number, ex factory date, etc. 6. Water pump identification: the number of pumps must be painted on each pump; For example: 1 # pump, 2 # pump, 3 # pump, 4 # pump, 5 # pump, words. 7. "Normally open" signboard of inlet and outlet valves; 8. The pipe shall be marked with water flow direction arrow; 9. The prefabricated energy-saving pump room needs a drainage system 10. The energy-saving pump room can realize on-site control and remote monitoring;