新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Heze recommends the price of pressure boosting and stabilizing integrated pump set

2020-10-08
 Heze recommends the price of pressure boosting and stabilizing integrated pump set

1. To ensure the safety of the pump room, the pump room must be locked. 2、 Boosting and stabilizing integrated pump set Price Safety Operation Regulations, Hygiene and Safety Management System for Secondary Water Supply, Patrol Inspection Specifications, Water Quality Inspection Record System must be posted inside. 3 recommend Boosting and stabilizing integrated pump set The following record files must be available inside: Patrol Inspection Record, Water Tank Blowdown Record, Disinfection Record, Water Quality Inspection Record. 4. The pump room must have a pressurized area mark, and the corresponding control system should also have a pressurized area mark: low area, middle area, high area, etc, Mark the product model, qualified number, ex factory date, etc. 6. Water pump identification: the number of pumps must be painted on each pump; For example: 1 # pump, 2 # pump, 3 # pump, 4 # pump, 5 # pump, words. 7. "Normally open" signboard of inlet and outlet valves; 8. The pipe shall be marked with water flow direction arrow; 9. The prefabricated energy-saving pump room needs a drainage system 10. The energy-saving pump room can realize on-site control and remote monitoring;

 Heze recommends the price of pressure boosting and stabilizing integrated pump set

Boosting and stabilizing integrated pump set Price General provisions: equipment discharging heat, steam or harmful substances, recommend Boosting and stabilizing integrated pump set Local exhaust should be adopted. When local ventilation can not be used or local ventilation can not meet the health requirements, it shall be supplemented with all-round ventilation or adopt all-round ventilation. The air distribution design shall be optimized according to the characteristics and changes of pollutants, and the normal operation of local exhaust system shall not be damaged. At the same time, when releasing waste heat, moisture and harmful substances, the ventilation volume in all aspects shall be determined according to the large air volume required. When the quantity of harmful substances cannot be determined, the ventilation volume in all aspects can be determined according to the ventilation frequency. All kinds of pump rooms in the domestic sewage treatment station should adopt natural ventilation. When mechanical ventilation is adopted, indoor air should not be recycled. All pump rooms in the oily sewage treatment station should adopt natural ventilation. When mechanical ventilation is adopted, indoor air should not be recycled, and the ventilator and motor should be explosion-proof and directly connected.

 Heze recommends the price of pressure boosting and stabilizing integrated pump set

recommend Boosting and stabilizing integrated pump set Operation and maintenance of the lifting pump station: 1. The operation management mode of the comprehensive sewage pump station includes the self management of the construction unit, the agent management of the equipment supplier, the centralized entrusted operation, and the self management of farmers. The appropriate mode can be selected according to the specific situation. 2. The design or construction unit of the sewage lift pump station shall train the operation management personnel after the completion acceptance and before the formal delivery of the project, and timely deliver the construction data and system operation management requirements together. 3. The operation and management personnel of the integrated pump station shall be familiar with the operation requirements, technical indicators and safe operation procedures of the treatment process, facilities and equipment, etc., patrol and inspect the operation of the sewage treatment facilities as required, and make operation records in a timely manner. 4. The operation management personnel of the pump station shall regularly maintain, check and clean the relevant equipment to prevent equipment failures and ensure the normal operation of the facilities. five Boosting and stabilizing integrated pump set Price Timely master the water quality of the treatment system to ensure that the water quality meets the standard; If the water quality is not up to the standard, find and solve the problem in time.

 Heze recommends the price of pressure boosting and stabilizing integrated pump set

recommend Boosting and stabilizing integrated pump set What is it? Boosting and stabilizing integrated pump set Price What can I do? We often hear that pump stations have many uses, and are dazzled by various articles. It seems that the more we understand them, the more difficult it is to understand them. Then we will talk about some introductions of pump stations and what they can do. First of all, the pump station looks ordinary to us. Its exterior is dark green glass fiber reinforced plastic cylinder, which seems very simple, but it is not. In fact, the internal structure of the pump station can be very complex and diverse. In the dark green shell of the integrated pump station, there are many parts and components. The core of the pump station we are talking about is the water pump. For pump stations of some sizes, there is not only one water pump, but basically all of them are from the water pump unit. As for the model selection of the pump, the previous articles have also talked about it, so I will not say much here.

 Heze recommends the price of pressure boosting and stabilizing integrated pump set

recommend Boosting and stabilizing integrated pump set What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Boosting and stabilizing integrated pump set Price Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.

Share to