新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Price of horizontal energy-saving end suction pump supplied by Shanghai

2020-10-09
 Price of horizontal energy-saving end suction pump supplied by Shanghai

supply Horizontal energy-saving end suction pump It is a new type of sewage and rainwater integrated automatic collection and lifting system, Horizontal energy-saving end suction pump Price It is an integrated pump station in a sense. The barrel body of the pump station is made of advanced materials, such as reinforced glass fiber or polyethylene resin for automatic casting. The internal water pump, pipeline, valve, instrument, control equipment, ladder and other accessories required by the user can be provided by Philippine Source in a complete set and delivered after installation and commissioning. He can even bring maintenance room and power grid, which is a new kind of integrated pump station equipment, easy to use, reliable quality, less civil work and low cost. High integration and volume optimization are the remarkable characteristics of the pump station, which are the substitutes for the traditional small and medium-sized concrete pump stations.

 Price of horizontal energy-saving end suction pump supplied by Shanghai

supply Horizontal energy-saving end suction pump How to choose? Horizontal energy-saving end suction pump Price The main equipment in the pump station selected according to the input and output are: various controllable valves, pump sets, grid systems, water level gauges, flow meters, etc. According to the requirements of the system and the different control methods adopted, as well as the nature, parameters and characteristics of the input and output signals, the appropriate PLC system can be flexibly selected. Select according to the storage capacity Calculate the actual capacity demand of the storage according to the number of nodes required for programming. The PLC control system used in the current pump station is selected according to the communication requirements, which is generally divided into equipment unit layer, pump station layer, dispatching layer, etc. Layers directly need to transmit various parameter information, so we should select the appropriate PLC equipment according to the field needs, such as network, expansion, off the shelf bus connection, investment and our own equipment.

 Price of horizontal energy-saving end suction pump supplied by Shanghai

supply Horizontal energy-saving end suction pump It is an important water conservancy equipment in urban infrastructure construction, Horizontal energy-saving end suction pump Price It is mainly used for municipal drainage, flood control and waterlogging drainage in flood season, and can be divided into sewage lift pump station and rainwater lift pump station according to the action objects. It is generally installed underground and connected with the urban underground sewage pipe network to collect domestic sewage and rainwater. It is a new environment-friendly pump station. After the mixing treatment, the water level is raised by pressurizing the water pump, and the sewage is transported to the sewage treatment plant, realizing the rapid discharge and treatment of urban sewage.

 Price of horizontal energy-saving end suction pump supplied by Shanghai

supply Horizontal energy-saving end suction pump "Good, fast and economical" Talking about the advantages of prefabricated pump house, Horizontal energy-saving end suction pump Price He said, "First of all, the quality of prefabricated concrete components is controllable, the deviation of appearance surface flatness is small, and the concrete strength of prefabricated products can reach C40, which is conducive to improving the instability of concrete quality of traditional cast-in-place structures; Secondly, the construction period is controllable. Prefabricated components are produced in factories, and on-site installation is mechanically hoisted, which is safe and convenient, and can greatly reduce the use of labor. The project duration can be free from the impact of natural weather and other factors; The third is energy conservation and environmental protection. The main body of the project is mostly prefabricated, and a large number of cement, sand and stone and other dust building materials do not need to enter the site. The construction has little impact on the surrounding urban environment. " The prefabricated steel structure building is a form of prefabricated building with high assembly rate, which covers the components of the system such as structure, enclosure, interior decoration and equipment pipeline. It is prefabricated in the factory, and the integrated module is transported to the construction site for assembly and connection to form a complete building. Fabricated steel structure buildings have the advantages of high standardization and high integration, which can greatly reduce the entire construction cycle.

Share to