新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Xinyang supply automation control equipment manufacturer

2020-10-12
 Xinyang supply automation control equipment manufacturer

supply Automatic control equipment "Good, fast and economical" Talking about the advantages of prefabricated pump house, Automatic control equipment Manufacturer He said, "First of all, the quality of prefabricated concrete components is controllable, the deviation of appearance surface flatness is small, and the concrete strength of prefabricated products can reach C40, which is conducive to improving the instability of concrete quality of traditional cast-in-place structures; Secondly, the construction period is controllable. Prefabricated components are produced in factories, and on-site installation is mechanically hoisted, which is safe and convenient, and can greatly reduce the use of labor. The project duration can be free from the impact of natural weather and other factors; The third is energy conservation and environmental protection. The main body of the project is mostly prefabricated, and a large number of cement, sand and stone and other dust building materials do not need to enter the site. The construction has little impact on the surrounding urban environment. " The prefabricated steel structure building is a form of prefabricated building with high assembly rate, which covers the components of the system such as structure, enclosure, interior decoration and equipment pipeline. It is prefabricated in the factory, and the integrated module is transported to the construction site for assembly and connection to form a complete building. Fabricated steel structure buildings have the advantages of high standardization and high integration, which can greatly reduce the entire construction cycle.

 Xinyang supply automation control equipment manufacturer

supply Automatic control equipment Application in water supply and drainage engineering, Automatic control equipment Manufacturer Introduction! In recent years, the speed of economic development in China has risen straightly, and GDP is in a steady growth state, which shows that people's living standards are constantly improving. But for the utilization of water resources, people generally have the deep-rooted idea of inexhaustible, which leads to the increasing waste and pollution of water resources. However, at present, the development of urban industrial production has increased the utilization of water resources, so the supply of fresh water resources has presented a shortage problem. In addition, the urban industrial development has aggravated the sewage problem, and the urban sewage problem has gradually become the primary factor threatening the normal development of the city and affecting the urban ecology. Compared with the western developed countries, China's water pollution treatment technology is relatively backward. We must learn from the advanced means and technologies of water pollution treatment in western developed countries, and explore a water pollution treatment road with Chinese characteristics in combination with China's own water pollution treatment status. There may be many problems in the process of exploration, but we must continue to improve and gradually improve the efficiency of water pollution treatment. In many cases, the speed of sewage treatment in China lags far behind the speed of water pollution, while high energy consumption increases the economic load, coupled with the low degree of automation of water pollution equipment, resulting in excessive labor consumption, which will cause difficulties in water pollution treatment in China.

 Xinyang supply automation control equipment manufacturer

supply Automatic control equipment What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Automatic control equipment Manufacturer Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.

 Xinyang supply automation control equipment manufacturer

Automatic control equipment Manufacturer It is a new electromechanical integrated water supply equipment composed of computer technology, frequency conversion technology and motor pump, to meet the requirements of urban water supply network that water pumping does not produce negative pressure, but also has a certain capacity of regulation and storage, and water supply is cut off during peak periods. Scope of application of integrated pump set: 1. Scope of application: it is applicable to pressurized water supply in areas with sufficient urban pipe network pressure. 2. Applicable project type: large intermediate booster pump station for production and domestic water of industrial and mining enterprises, and water supply of waterworks. 3、 supply Automatic control equipment Applicable project position: water supply secondary pressurization system. 4. Other scope of application: domestic water for new, reconstructed and expanded residential buildings, office buildings, hotels, restaurants and other public buildings. 5. Type of using unit: design unit, construction unit and supervision unit.

Share to