supply Integrated sewage pump set Talking about why the country should vigorously promote smart water, Integrated sewage pump set manufactor How to build a smart pump house? The four ministries and commissions of the country put forward safeguard measures and requirements on improving and improving the construction and management of secondary water supply infrastructure for urban residents to ensure water quality safety, requiring that the construction and management of secondary water supply infrastructure should be improved and improved in all aspects to ensure the scientific planning and construction of secondary water supply infrastructure and promote the systematic operation and maintenance of secondary water supply infrastructure. Promote the formation of a new pattern of secondary water supply infrastructure construction and management with clear rights and responsibilities, professional management and adequate supervision, and solve the water quality safety problem of "one kilometer after the urban water supply".
supply Integrated sewage pump set What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Integrated sewage pump set manufactor Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.
supply Integrated sewage pump set Operation and maintenance of the lifting pump station: 1. The operation management mode of the comprehensive sewage pump station includes the self management of the construction unit, the agent management of the equipment supplier, the centralized entrusted operation, and the self management of farmers. The appropriate mode can be selected according to the specific situation. 2. The design or construction unit of the sewage lift pump station shall train the operation management personnel after the completion acceptance and before the formal delivery of the project, and timely deliver the construction data and system operation management requirements together. 3. The operation and management personnel of the integrated pump station shall be familiar with the operation requirements, technical indicators and safe operation procedures of the treatment process, facilities and equipment, etc., patrol and inspect the operation of the sewage treatment facilities as required, and make operation records in a timely manner. 4. The operation management personnel of the pump station shall regularly maintain, check and clean the relevant equipment to prevent equipment failures and ensure the normal operation of the facilities. five Integrated sewage pump set manufactor Timely master the water quality of the treatment system to ensure that the water quality meets the standard; If the water quality is not up to the standard, find and solve the problem in time.
Compared with traditional pump stations, Integrated sewage pump set manufactor The required installation and commissioning time is greatly reduced. supply Integrated sewage pump set The existing integrated sewage pump station is technically improved, and private customization is provided. In addition, why is the price of qualified fire pump not expensive? The correct fire pump manufacturers, especially those with full qualifications and years of experience, are first of all professional enough in production technology. The working procedures of the system machine, submersible sewage pump and other main control equipment are fed into the PLC machine to achieve automatic operation, so as to reduce the operating workload and reduce unnecessary human damage. The ground occupies only a few square meters, so space is saved. Precautions when selecting comprehensive sewage pump station, remember! The sewage comprehensive pump station has a great impact on sewage treatment, and is a favorite sewage treatment product of many units and enterprises.
1. To ensure the safety of the pump room, the pump room must be locked. 2、 Integrated sewage pump set manufactor Safety Operation Regulations, Hygiene and Safety Management System for Secondary Water Supply, Patrol Inspection Specifications, Water Quality Inspection Record System must be posted inside. 3 supply Integrated sewage pump set The following record files must be available inside: Patrol Inspection Record, Water Tank Blowdown Record, Disinfection Record, Water Quality Inspection Record. 4. The pump room must have a pressurized area mark, and the corresponding control system should also have a pressurized area mark: low area, middle area, high area, etc, Mark the product model, qualified number, ex factory date, etc. 6. Water pump identification: the number of pumps must be painted on each pump; For example: 1 # pump, 2 # pump, 3 # pump, 4 # pump, 5 # pump, words. 7. "Normally open" signboard of inlet and outlet valves; 8. The pipe shall be marked with water flow direction arrow; 9. The prefabricated energy-saving pump room needs a drainage system 10. The energy-saving pump room can realize on-site control and remote monitoring;