1. To ensure the safety of the pump room, the pump room must be locked. 2、 Ordinary horizontal centrifugal pump manufactor Safety Operation Regulations, Hygiene and Safety Management System for Secondary Water Supply, Patrol Inspection Specifications, Water Quality Inspection Record System must be posted inside. 3 large Ordinary horizontal centrifugal pump The following record files must be available inside: Patrol Inspection Record, Water Tank Blowdown Record, Disinfection Record, Water Quality Inspection Record. 4. The pump room must have a pressurized area mark, and the corresponding control system should also have a pressurized area mark: low area, middle area, high area, etc, Mark the product model, qualified number, ex factory date, etc. 6. Water pump identification: the number of pumps must be painted on each pump; For example: 1 # pump, 2 # pump, 3 # pump, 4 # pump, 5 # pump, words. 7. "Normally open" signboard of inlet and outlet valves; 8. The pipe shall be marked with water flow direction arrow; 9. The prefabricated energy-saving pump room needs a drainage system 10. The energy-saving pump room can realize on-site control and remote monitoring;
large Ordinary horizontal centrifugal pump There were few original cast-in-place operations on the site, and the health did not disturb the residents. From then on, we bid farewell to the "gray and hazy" construction site. In addition, the reuse rate of steel formwork and other materials has been improved, and the waste, loss and energy saving can be reduced by more than half. It can be seen that, Ordinary horizontal centrifugal pump manufactor It makes up for the shortcomings of the existing reinforced concrete operation, and the quality of the houses is also very good, which is acceptable to the public. Think about the future when prefabricated housing becomes the main construction industry in China, there will be no more dust flying around the construction site and no more construction waste everywhere. At present, the environment in our country is getting worse and worse. It can be seen that the energy-saving pump room is not only good, but also very promising.
In recent years, with the construction of more and more pump houses around the country, problems related to them have become increasingly apparent, Ordinary horizontal centrifugal pump manufactor Management and maintenance, water pollution, safety management and other issues are gradually exposed. How to further strengthen the management level of the above pump room facilities and equipment, further improve and ensure the safe water supply capacity, and manage and maintain all kinds of facilities and equipment in the pump room has become the common concern and work direction of all major water supply management enterprises and water supply equipment manufacturers. Standardized standard pump room construction and management introduced, large Ordinary horizontal centrifugal pump Mainly based on the optimized configuration and construction of various facilities and equipment in the pump room, the computer network information technology is used to organically integrate various nodes in the pump room. At the same time, in combination with the local economic construction level, according to the actual situation and budget needs of the project, a reasonable standardized construction, management and maintenance scheme is provided and implemented for various pump rooms. Its core is the safe full frequency conversion control pressurization equipment, followed by the integration of computer network information system, and the safety management and maintenance of the whole life cycle.
large Ordinary horizontal centrifugal pump It is not only reflected in its working ability, but also in its excellent manufacturing process and maintenance costs. The integrated prefabricated pump station is highly integrated, so its volume is very small. It is a good choice for sewage treatment equipment for some factories and business districts that do not have a shortage of land. In addition, Ordinary horizontal centrifugal pump manufactor The degree of intelligence is very high, so its failure rate is very low. Combined with the application of anti blocking technology, the integrated prefabricated pump station becomes very convenient in the later use, which greatly reduces the labor cost and maintenance cost.
large Ordinary horizontal centrifugal pump What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Ordinary horizontal centrifugal pump manufactor Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.