新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Price of pressure boosting and stabilizing integrated pump unit supplied by Huizhou

2020-11-19
 Price of pressure boosting and stabilizing integrated pump unit supplied by Huizhou

supply Boosting and stabilizing integrated pump set It is a new type of sewage and rainwater integrated automatic collection and lifting system, Boosting and stabilizing integrated pump set Price It is an integrated pump station in a sense. The barrel body of the pump station is made of advanced materials, such as reinforced glass fiber or polyethylene resin for automatic casting. The internal water pump, pipeline, valve, instrument, control equipment, ladder and other accessories required by the user can be provided by Philippine Source in a complete set and delivered after installation and commissioning. He can even bring maintenance room and power grid, which is a new kind of integrated pump station equipment, easy to use, reliable quality, less civil work and low cost. High integration and volume optimization are the remarkable characteristics of the pump station, which are the substitutes for the traditional small and medium-sized concrete pump stations.

 Price of pressure boosting and stabilizing integrated pump unit supplied by Huizhou

supply Boosting and stabilizing integrated pump set It is an important water conservancy equipment in urban infrastructure construction, Boosting and stabilizing integrated pump set Price It is mainly used for municipal drainage, flood control and waterlogging drainage in flood season, and can be divided into sewage lift pump station and rainwater lift pump station according to the action objects. It is generally installed underground and connected with the urban underground sewage pipe network to collect domestic sewage and rainwater. It is a new environment-friendly pump station. After the mixing treatment, the water level is raised by pressurizing the water pump, and the sewage is transported to the sewage treatment plant, realizing the rapid discharge and treatment of urban sewage.

 Price of pressure boosting and stabilizing integrated pump unit supplied by Huizhou

Boosting and stabilizing integrated pump set Price The design principle is: (1) The overall layout should be reasonable, especially for the pump stations that combine irrigation and drainage or self drainage, self diversion and water lifting, as well as the pump stations that combine gates and stations, the layout should be as compact as possible, making full use of buildings for regulation. (2) The selection of pump type shall strive to make the design head of the pump station consistent with the rated head of the pump, and meet the requirements of irrigation and drainage flow. The pump type with advanced technology shall be selected as far as possible to ensure high efficiency of the pump station device and low operation cost. At the same time, the selected pump type should be relatively mature, with certain operation practice, and the test pump type should be avoided as far as possible. (3) The selection of pump type shall fully consider the use and working nature of the integrated pump station. For irrigation and make-up water pump stations with long annual working hours, pumps with wide range, high efficiency and good cavitation performance shall be selected. For those pumping stations focusing on drainage, the pump type with reliable working performance and simple structure shall be selected. (4) The project layout shall adopt positive water inflow as far as possible to ensure that the water inflow condition of each unit is good and the flow pattern is uniform. supply Boosting and stabilizing integrated pump set When lateral water inflow has to be adopted in the project layout, the distance between the lateral water inlet and the pump shall be extended as far as possible in the design, and certain diversion measures shall be taken. (5) The design of the outlet pool should try to avoid sharp bends that cause water impact and backwater. The pressure water tank shall be designed to avoid the increase of energy loss due to the mutual impact of water flow in each outlet pipe. (6) The construction materials available locally shall be used as far as possible. The design shall ensure simple and convenient construction and less project investment.

 Price of pressure boosting and stabilizing integrated pump unit supplied by Huizhou

supply Boosting and stabilizing integrated pump set What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Boosting and stabilizing integrated pump set Price Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.

Share to