新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Suzhou recommended pressure vessel manufacturer

2020-12-06
 Suzhou recommended pressure vessel manufacturer

Pressure vessel manufactor It is of great significance to use light weight and small volume FRP materials, adopt integrated structural design, and occupy a small area, effectively relieving the current situation of land resource tension. During the design and development of the pump station, advanced innovative ideas were introduced to provide people with high-quality life services. recommend Pressure vessel On the premise of liberating human resources, it has realized the treatment of domestic sewage and rainwater, and the sewage treatment effect is also very good. On the premise of ensuring the functional requirements of the pump station, the impact of the construction and use of the pump station on the surrounding environment is minimized, which effectively promotes the promotion and application of the pump station.

 Suzhou recommended pressure vessel manufacturer

Pressure vessel manufactor General provisions: equipment discharging heat, steam or harmful substances, recommend Pressure vessel Local exhaust should be adopted. When local ventilation can not be used or local ventilation can not meet the health requirements, it shall be supplemented with all-round ventilation or adopt all-round ventilation. The air distribution design shall be optimized according to the characteristics and changes of pollutants, and the normal operation of local exhaust system shall not be damaged. At the same time, when releasing waste heat, moisture and harmful substances, the ventilation volume in all aspects shall be determined according to the large air volume required. When the quantity of harmful substances cannot be determined, the ventilation volume in all aspects can be determined according to the ventilation frequency. All kinds of pump rooms in the domestic sewage treatment station should adopt natural ventilation. When mechanical ventilation is adopted, indoor air should not be recycled. All pump rooms in the oily sewage treatment station should adopt natural ventilation. When mechanical ventilation is adopted, indoor air should not be recycled, and the ventilator and motor should be explosion-proof and directly connected.

 Suzhou recommended pressure vessel manufacturer

recommend Pressure vessel Explain the structure of the integrated prefabricated pump station: 1. Outdoor stainless steel control cabinet: manual and automatic. The following control functions can be realized: (1) Daily automatic position, realizing unattended pump station. (2) Two for use and one for standby, mutual standby, automatic switching, high water level working at the same time, automatic fault switching. 2. Crushing grid: the crushing grid is placed at the inlet of the FRP cylinder of the pump station, and the submersible crushing grid is safe and reliable; The supporting guide rail is convenient for maintenance and overhaul. 3. Liquid level sensor: pressure sensor (standard configuration)/floating ball switch/water level electrode is used, and special monitoring relay is provided to realize automatic control operation of pump station liquid level. four Pressure vessel manufactor Service platform: built-in service platform for valve and water pump maintenance; Customize platforms in different forms, locations and heights as required.

 Suzhou recommended pressure vessel manufacturer

recommend Pressure vessel What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Pressure vessel manufactor Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.

 Suzhou recommended pressure vessel manufacturer

recommend Pressure vessel Operation and maintenance of the lifting pump station: 1. The operation management mode of the comprehensive sewage pump station includes the self management of the construction unit, the agent management of the equipment supplier, the centralized entrusted operation, and the self management of farmers. The appropriate mode can be selected according to the specific situation. 2. The design or construction unit of the sewage lift pump station shall train the operation management personnel after the completion acceptance and before the formal delivery of the project, and timely deliver the construction data and system operation management requirements together. 3. The operation and management personnel of the integrated pump station shall be familiar with the operation requirements, technical indicators and safe operation procedures of the treatment process, facilities and equipment, etc., patrol and inspect the operation of the sewage treatment facilities as required, and make operation records in a timely manner. 4. The operation management personnel of the pump station shall regularly maintain, check and clean the relevant equipment to prevent equipment failures and ensure the normal operation of the facilities. five Pressure vessel manufactor Timely master the water quality of the treatment system to ensure that the water quality meets the standard; If the water quality is not up to the standard, find and solve the problem in time.

Share to