新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Yangjiang large-scale HVAC integrated pump set manufacturer

2020-12-07
 Yangjiang large-scale HVAC integrated pump set manufacturer

HVAC integrated pump set Manufacturer Introduce the basic structure of the integrated pump station: 1 large HVAC integrated pump set The GRP glass fiber reinforced plastic cylinder is made of GRP glass fiber reinforced plastic, and the process is continuous mechanical winding. It is characterized by firmness, durability, non leakage, corrosion resistance, and a service life of 50 years. 2. The base is made of GRP glass fiber reinforced plastic, and the process is molding. It is characterized by anti clogging, anti floating and anti sinking, and its service life can also reach 50 years. 3. The top cover is generally made of embossed aluminum plate, or stainless steel, glass fiber reinforced plastic and other materials, which is used for personnel access. 4. Handrails are made of 304 stainless steel or 316 stainless steel. 5. The control cabinet can be made of 304 stainless steel or 316 stainless steel, which is the core of intelligent control. 6. The flange is made of 304 stainless steel. 7. Check valve, with various stainless steel materials, such as 304, 201, 316, etc. 8. Gate valve is made of 304 stainless steel, or 201, 316, etc. 9. The grating support is made of 304 stainless steel. Similarly, 316 stainless steel can also be selected.

 Yangjiang large-scale HVAC integrated pump set manufacturer

Users also have this problem again. First of all, we should know the composition of the pump station. ad locum, HVAC integrated pump set Manufacturer The pump set is divided into three parts. Main body of pump unit, external control equipment and internal equipment. First, we should select the wall thickness of the pump unit cylinder according to the actual demand. The factors to be considered here include: geology, temperature, working environment of pump unit, altitude, etc. Therefore, the selection of pump unit cylinder wall thickness should be summarized and considered. The wall thickness directly affects the firmness of the pump set. Of course, the selection of internal equipment is also important. During this period, the selection of submersible sewage pump is important. Here, the selection of flow head of submersible sewage pump is important. large HVAC integrated pump set The flow head of submersible sewage pump shall be selected according to the actual situation. There are many types of submersible sewage pumps. For example, 200 in front of 200WQ300-7-15 refers to the diameter, WQ refers to the pump type, and 300 refers to the flow of 300m ³/ h. 7 refers to the lift of 7m, and 15 refers to the power of this submersible pump of 15KW.

 Yangjiang large-scale HVAC integrated pump set manufacturer

1. To ensure the safety of the pump room, the pump room must be locked. 2、 HVAC integrated pump set Manufacturer Safety Operation Regulations, Hygiene and Safety Management System for Secondary Water Supply, Patrol Inspection Specifications, Water Quality Inspection Record System must be posted inside. 3 large HVAC integrated pump set There must be the following record documents inside: Patrol Inspection Record, Water Tank Blowdown Record, Disinfection Record, Water Quality Inspection Record. 4. The pump room must be marked with the pressurized area, and the corresponding control system should also be marked with the pressurized area: low area, middle area, high area, etc, Mark the product model, qualified number, ex factory date, etc. 6. Water pump identification: the number of pumps must be painted on each pump; For example: 1 # pump, 2 # pump, 3 # pump, 4 # pump, 5 # pump, words. 7. "Normally open" signboard of inlet and outlet valves; 8. The pipe shall be marked with water flow direction arrow; 9. The prefabricated energy-saving pump room needs a drainage system 10. The energy-saving pump room can realize on-site control and remote monitoring;

 Yangjiang large-scale HVAC integrated pump set manufacturer

large HVAC integrated pump set There were few original cast-in-place operations on the site, and the health did not disturb the residents. From then on, we bid farewell to the "gray and hazy" construction site. In addition, the reuse rate of steel formwork and other materials has been improved, and the waste, loss and energy saving can be reduced by more than half. It can be seen that, HVAC integrated pump set Manufacturer It makes up for the shortcomings of the existing reinforced concrete operations, and the quality of the houses is also very good, which is acceptable to the public. Think about the future when prefabricated housing becomes the main construction industry in China, there will be no more dust flying around the construction site and no more construction waste everywhere. At present, the environment in our country is getting worse and worse. It can be seen that the energy-saving pump room is not only good, but also very promising.

 Yangjiang large-scale HVAC integrated pump set manufacturer

large HVAC integrated pump set Explain the structure of the integrated prefabricated pump station: 1. Outdoor stainless steel control cabinet: manual and automatic. The following control functions can be realized: (1) Daily automatic position, realizing unattended pump station. (2) Two for use and one for standby, mutual standby, automatic switching, high water level working at the same time, automatic fault switching. 2. Crushing grid: the crushing grid is placed at the inlet of the FRP cylinder of the pump station, and the submersible crushing grid is safe and reliable; The supporting guide rail is convenient for maintenance and overhaul. 3. Liquid level sensor: pressure sensor (standard configuration)/floating ball switch/water level electrode is used, and special monitoring relay is provided to realize automatic control operation of pump station liquid level. four HVAC integrated pump set Manufacturer Service platform: built-in service platform for valve and water pump maintenance; Customize platforms in different forms, locations and heights as required.

Share to