Huaibei Large Assembled Machine Room Manufacturer

2020-12-11
 Huaibei Large Assembled Machine Room Manufacturer

In recent years, with the construction of more and more pump houses around the country, problems related to them have become increasingly apparent, Assembled machine room manufactor Management and maintenance, water pollution, safety management and other issues are gradually exposed. How to further strengthen the management level of the above pump room facilities and equipment, further improve and ensure the safe water supply capacity, and manage and maintain all kinds of facilities and equipment in the pump room has become the common concern and work direction of all major water supply management enterprises and water supply equipment manufacturers. Standardized standard pump room construction and management introduced, large Assembled machine room Mainly based on the optimized configuration and construction of various facilities and equipment in the pump room, the computer network information technology is used to organically integrate various nodes in the pump room. At the same time, in combination with the local economic construction level, according to the actual situation and budget needs of the project, a reasonable standardized construction, management and maintenance scheme is provided and implemented for various pump rooms. Its core is the safe full frequency conversion control pressurization equipment, followed by the integration of computer network information system, and the safety management and maintenance of the whole life cycle.

 Huaibei Large Assembled Machine Room Manufacturer

large Assembled machine room It is an important water conservancy equipment in urban infrastructure construction, Assembled machine room manufactor It is mainly used for municipal drainage, flood control and waterlogging drainage in flood season, and can be divided into sewage lift pump station and rainwater lift pump station according to the action objects. It is generally installed underground and connected with the urban underground sewage pipe network to collect domestic sewage and rainwater. It is a new environment-friendly pump station. After the mixing treatment, the water level is raised by pressurizing the water pump, and the sewage is transported to the sewage treatment plant, realizing the rapid discharge and treatment of urban sewage.

 Huaibei Large Assembled Machine Room Manufacturer

large Assembled machine room What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Assembled machine room manufactor Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.

 Huaibei Large Assembled Machine Room Manufacturer

large Assembled machine room "Good, fast and economical" Talking about the advantages of prefabricated pump house, Assembled machine room manufactor He said, "First of all, the quality of prefabricated concrete components is controllable, the deviation of appearance surface flatness is small, and the concrete strength of prefabricated products can reach C40, which is conducive to improving the instability of concrete quality of traditional cast-in-place structures; Secondly, the construction period is controllable. Prefabricated components are produced in factories, and on-site installation is mechanically hoisted, which is safe and convenient, and can also significantly reduce the use of labor. The project duration can be free from the impact of natural weather and other factors; The third is energy conservation and environmental protection. The main body of the project is mostly prefabricated, and a large number of cement, sand and stone and other dust building materials do not need to enter the site. The construction has little impact on the surrounding urban environment. " The prefabricated steel structure building is a form of prefabricated building with high assembly rate, which covers the components of the system such as structure, enclosure, interior decoration and equipment pipeline. It is prefabricated in the factory, and the integrated module is transported to the construction site for assembly and connection to form a complete building. Fabricated steel structure buildings have the advantages of high standardization and high integration, which can greatly reduce the entire construction cycle.

 Huaibei Large Assembled Machine Room Manufacturer

1、 Assembled machine room manufactor Location selection. large Assembled machine room It is the core part of the water supply and fire fighting pipe network of the whole building or the whole community, plant area. The location of the pump room should be selected not only to facilitate the laying of the water supply and fire fighting pipe network, but also not to have noise impact on rooms with quiet requirements. It should also try to minimize the occupancy of valuable buildings (such as shops and parking spaces). The domestic water supply pump room and fire pump room should be built together, which can not only save land, but also facilitate maintenance management. For a residential area, the pump room is often designed in the equipment room of the underground garage, and is combined with the generator room and other electrical and air-conditioning rooms in the same fire compartment. And the pump room should be as close as possible to the middle of the large water users or the whole community, which can reduce the length of the main pipe and reduce the head loss of the pipe network. The outlet of the pump room shall be directly connected to the outdoor or the emergency exit. If the pump house is located in a civil building, it should not be adjacent to the neighbor's house or on its upper or lower floors, and the pump house should be located in a well ventilated room without freezing. The size of the pump room is determined by the layout of the living pool, fire pool and pump set.