新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Foshan recommends the manufacturer of integrated transmission and distribution pump set

2020-12-12
 Foshan recommends the manufacturer of integrated transmission and distribution pump set

recommend Integrated transmission and distribution pump set Explain the structure of the integrated prefabricated pump station: 1. Outdoor stainless steel control cabinet: manual and automatic. The following control functions can be realized: (1) Daily automatic position, realizing unattended pump station. (2) Two for use and one for standby, mutual standby, automatic switching, high water level working at the same time, automatic fault switching. 2. Crushing grid: the crushing grid is placed at the inlet of the FRP cylinder of the pump station, and the submersible crushing grid is safe and reliable; The supporting guide rail is convenient for maintenance and overhaul. 3. Liquid level sensor: pressure sensor (standard configuration)/floating ball switch/water level electrode is used, and special monitoring relay is provided to realize automatic control operation of pump station liquid level. four Integrated transmission and distribution pump set Manufacturer Service platform: built-in service platform for valve and water pump maintenance; Customize platforms in different forms, locations and heights as required.

 Foshan recommends the manufacturer of integrated transmission and distribution pump set

recommend Integrated transmission and distribution pump set How to choose? Integrated transmission and distribution pump set Manufacturer The main equipment in the pump station selected according to the input and output are: various controllable valves, pump sets, grid systems, water level gauges, flow meters, etc. According to the requirements of the system and the different control methods adopted, as well as the nature, parameters and characteristics of the input and output signals, the appropriate PLC system can be flexibly selected. Select according to the storage capacity Calculate the actual capacity demand of the storage according to the number of nodes required for programming. The PLC control system used in the current pump station is selected according to the communication requirements, which is generally divided into equipment unit layer, pump station layer, dispatching layer, etc. Layers directly need to transmit various parameter information, so we should select the appropriate PLC equipment according to the field needs, such as network, expansion, off the shelf bus connection, investment and our own equipment.

 Foshan recommends the manufacturer of integrated transmission and distribution pump set

recommend Integrated transmission and distribution pump set It is a new type of sewage and rainwater integrated automatic collection and lifting system, Integrated transmission and distribution pump set Manufacturer It is an integrated pump station in a sense. The barrel body of the pump station is made of advanced materials, such as reinforced glass fiber or polyethylene resin for automatic casting. The internal water pump, pipeline, valve, instrument, control equipment, ladder and other accessories required by the user can be provided by Philippine Source in a complete set and delivered after installation and commissioning. He can even bring maintenance room and power grid, which is a new kind of integrated pump station equipment, easy to use, reliable quality, less civil work and low cost. High integration and volume optimization are the remarkable characteristics of the pump station, which are the substitutes for the traditional small and medium-sized concrete pump stations.

 Foshan recommends the manufacturer of integrated transmission and distribution pump set

recommend Integrated transmission and distribution pump set What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Integrated transmission and distribution pump set Manufacturer Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.

Share to