新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Suzhou large high-temperature energy-saving centrifugal pump manufacturer

2020-12-13
 Suzhou large high-temperature energy-saving centrifugal pump manufacturer

large High temperature energy-saving centrifugal pump Operation and maintenance of the lifting pump station: 1. The operation management mode of the comprehensive sewage pump station includes the self management of the construction unit, the agent management of the equipment supplier, the centralized entrusted operation, and the self management of farmers. The appropriate mode can be selected according to the specific situation. 2. The design or construction unit of the sewage lift pump station shall train the operation management personnel after the completion acceptance and before the formal delivery of the project, and timely deliver the construction data and system operation management requirements together. 3. The operation and management personnel of the integrated pump station shall be familiar with the operation requirements, technical indicators and safe operation procedures of the treatment process, facilities and equipment, etc., patrol and inspect the operation of the sewage treatment facilities as required, and make operation records in a timely manner. 4. The operation management personnel of the pump station shall regularly maintain, check and clean the relevant equipment to prevent equipment failures and ensure the normal operation of the facilities. five High temperature energy-saving centrifugal pump Manufacturer Timely master the water quality of the treatment system to ensure that the water quality meets the standard; If the water quality is not up to the standard, find and solve the problem in time.

 Suzhou large high-temperature energy-saving centrifugal pump manufacturer

Compared with traditional pump stations, High temperature energy-saving centrifugal pump Manufacturer The required installation and commissioning time is greatly reduced. large High temperature energy-saving centrifugal pump The existing integrated sewage pump station is technically improved, and private customization is provided. In addition, why is the price of qualified fire pump not expensive? The correct fire pump manufacturers, especially those with full qualifications and years of experience, are first of all professional enough in production technology. The working procedures of the system machine, submersible sewage pump and other main control equipment are fed into the PLC machine to achieve automatic operation, so as to reduce the operating workload and reduce unnecessary human damage. The ground occupies only a few square meters, so space is saved. Precautions when selecting comprehensive sewage pump station, remember! The sewage comprehensive pump station has a great impact on sewage treatment, and is a favorite sewage treatment product of many units and enterprises.

 Suzhou large high-temperature energy-saving centrifugal pump manufacturer

1. To ensure the safety of the pump room, the pump room must be locked. 2、 High temperature energy-saving centrifugal pump Manufacturer Safety Operation Regulations, Hygiene and Safety Management System for Secondary Water Supply, Patrol Inspection Specifications, Water Quality Inspection Record System must be posted inside. 3 large High temperature energy-saving centrifugal pump The following record files must be available inside: Patrol Inspection Record, Water Tank Blowdown Record, Disinfection Record, Water Quality Inspection Record. 4. The pump room must have a pressurized area mark, and the corresponding control system should also have a pressurized area mark: low area, middle area, high area, etc, Mark the product model, qualified number, ex factory date, etc. 6. Water pump identification: the number of pumps must be painted on each pump; For example: 1 # pump, 2 # pump, 3 # pump, 4 # pump, 5 # pump, words. 7. "Normally open" signboard of inlet and outlet valves; 8. The pipe shall be marked with water flow direction arrow; 9. The prefabricated energy-saving pump room needs a drainage system 10. The energy-saving pump room can realize on-site control and remote monitoring;

 Suzhou large high-temperature energy-saving centrifugal pump manufacturer

large High temperature energy-saving centrifugal pump How to choose? High temperature energy-saving centrifugal pump Manufacturer The main equipment in the pump station selected according to the input and output are: various controllable valves, pump sets, grid systems, water level gauges, flow meters, etc. According to the requirements of the system and the different control methods adopted, as well as the nature, parameters and characteristics of the input and output signals, the appropriate PLC system can be flexibly selected. Select according to the storage capacity Calculate the actual capacity demand of the storage according to the number of nodes required for programming. The PLC control system used in the current pump station is selected according to the communication requirements, which is generally divided into equipment unit layer, pump station layer, dispatching layer, etc. Layers directly need to transmit various parameter information, so we should select the appropriate PLC equipment according to the field needs, such as network, expansion, off the shelf bus connection, investment and our own equipment.

 Suzhou large high-temperature energy-saving centrifugal pump manufacturer

High temperature energy-saving centrifugal pump Manufacturer This paper introduces the advantages of the assembled steel structure building: 1. Standardization: standardization is the basis of modular construction. The standardization of module geometric size, connection mode, module combination form, internal parts, equipment and facilities is the basic guarantee to realize rapid and high-quality construction. 2. Modularization: all functional spaces are composed of modules with a high degree of standardization, which fully reflects the speed advantages brought by standardization and integration and meets the needs of emergency medical facilities construction. 3. Industrialization: the construction will be completed in a short time, and the designer will make full use of the existing module product size. While processing the floor on site, modules are produced synchronously in the factory. The factory environment and indoor construction conditions will ensure that its quality is easier to control and improve, defects are reduced, product reliability is improved, and production efficiency is high. 4. Assembling: the construction period on site is very short. In addition to wet operations such as floor leveling and foundation treatment, other parts of the site, such as equipment pipeline installation, door and window installation, indoor facilities installation, etc., are completely dry construction. Different types of work cross each other. Compared with traditional construction methods, it saves time, large High temperature energy-saving centrifugal pump Construction and decoration waste will also be reduced by about 70%.

Share to