新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Manufacturer of assembled machine room supplied by Qingdao

2020-12-21
 Manufacturer of assembled machine room supplied by Qingdao

supply Assembled machine room As the underground installation is adopted, it can be directly installed around the residential area, and because of its small floor area, the characteristics of the whole underground installation will not affect the lives of residents. The harmony and unity with the surrounding environment can be achieved through the landscape control room above the ground. Assembled machine room manufactor It is used in places that cannot rely on gravity to discharge sewage by itself. Waste water below the water level of the waterway is collected through the sewage tank, as well as waste water discharged far away from the municipal sewage pipe network and sanitary facilities, and sewage is transported to the sewage pipe network with the help of the sewage pump.

 Manufacturer of assembled machine room supplied by Qingdao

supply Assembled machine room Application in water supply and drainage engineering, Assembled machine room manufactor Introduction! In recent years, the speed of economic development in China has risen straightly, and GDP is in a steady growth state, which shows that people's living standards are constantly improving. But for the utilization of water resources, people generally have the deep-rooted idea of inexhaustible, which leads to the increasing waste and pollution of water resources. However, at present, the development of urban industrial production has increased the utilization of water resources, so the supply of fresh water resources has presented a shortage problem. In addition, the urban industrial development has aggravated the sewage problem, and the urban sewage problem has gradually become the primary factor threatening the normal development of the city and affecting the urban ecology. Compared with the western developed countries, China's water pollution treatment technology is relatively backward. We must learn from the advanced means and technologies of water pollution treatment in western developed countries, and explore a water pollution treatment road with Chinese characteristics in combination with China's own water pollution treatment status. There may be many problems in the process of exploration, but we must continue to improve and gradually improve the efficiency of water pollution treatment. In many cases, the speed of sewage treatment in China lags far behind the speed of water pollution, while high energy consumption increases the economic load, coupled with the low degree of automation of water pollution equipment, resulting in excessive labor consumption, which will cause difficulties in water pollution treatment in China.

 Manufacturer of assembled machine room supplied by Qingdao

supply Assembled machine room How to choose? Assembled machine room manufactor The main equipment in the pump station selected according to the input and output are: various controllable valves, pump sets, grid systems, water level gauges, flow meters, etc. According to the requirements of the system and the different control methods adopted, as well as the nature, parameters and characteristics of the input and output signals, the appropriate PLC system can be flexibly selected. Select according to the storage capacity Calculate the actual capacity demand of the storage according to the number of nodes required for programming. The PLC control system used in the current pump station is selected according to the communication requirements, which is generally divided into equipment unit layer, pump station layer, dispatching layer, etc. Layers directly need to transmit various parameter information, so we should select the appropriate PLC equipment according to the field needs, such as network, expansion, off the shelf bus connection, investment and our own equipment.

 Manufacturer of assembled machine room supplied by Qingdao

supply Assembled machine room Explain the structure of the integrated prefabricated pump station: 1. Outdoor stainless steel control cabinet: manual and automatic. The following control functions can be realized: (1) Daily automatic position, realizing unattended pump station. (2) Two for use and one for standby, mutual standby, automatic switching, high water level working at the same time, automatic fault switching. 2. Crushing grid: the crushing grid is placed at the inlet of the FRP cylinder of the pump station, and the submersible crushing grid is safe and reliable; The supporting guide rail is convenient for maintenance and overhaul. 3. Liquid level sensor: pressure sensor (standard configuration)/floating ball switch/water level electrode is used, and special monitoring relay is provided to realize automatic control operation of pump station liquid level. four Assembled machine room manufactor Service platform: built-in service platform for valve and water pump maintenance; Customize platforms in different forms, locations and heights as required.

 Manufacturer of assembled machine room supplied by Qingdao

supply Assembled machine room "Good, fast and economical" Talking about the advantages of prefabricated pump house, Assembled machine room manufactor He said, "First of all, the quality of prefabricated concrete components is controllable, the deviation of appearance surface flatness is small, and the concrete strength of prefabricated products can reach C40, which is conducive to improving the instability of concrete quality of traditional cast-in-place structures; Secondly, the construction period is controllable. Prefabricated components are produced in factories, and on-site installation is mechanically hoisted, which is safe and convenient, and can also significantly reduce the use of labor. The project duration can be free from the impact of natural weather and other factors; The third is energy conservation and environmental protection. The main body of the project is mostly prefabricated, and a large number of cement, sand and stone and other dust building materials do not need to enter the site. The construction has little impact on the surrounding urban environment. " The prefabricated steel structure building is a form of prefabricated building with high assembly rate, which covers the components of the system such as structure, enclosure, interior decoration and equipment pipeline. It is prefabricated in the factory, and the integrated module is transported to the construction site for assembly and connection to form a complete building. Fabricated steel structure buildings have the advantages of high standardization and high integration, which can greatly reduce the entire construction cycle.

Share to