新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Recommended price of prefabricated machine room in Xuzhou

2020-12-27
 Recommended price of prefabricated machine room in Xuzhou

Assembled machine room Price It is a new electromechanical integrated water supply equipment composed of computer technology, frequency conversion technology and motor pump, to meet the requirements of urban water supply network that water pumping does not produce negative pressure, but also has a certain capacity of regulation and storage, and water supply is cut off during peak periods. Scope of application of integrated pump set: 1. Scope of application: it is applicable to pressurized water supply in areas with sufficient urban pipe network pressure. 2. Applicable project type: large intermediate booster pump station for production and domestic water of industrial and mining enterprises, and water supply of waterworks. 3、 recommend Assembled machine room Applicable project position: water supply secondary pressurization system. 4. Other scope of application: domestic water for new, reconstructed and expanded residential buildings, office buildings, hotels, restaurants and other public buildings. 5. Type of using unit: design unit, construction unit and supervision unit.

 Recommended price of prefabricated machine room in Xuzhou

recommend Assembled machine room Application in water supply and drainage engineering, Assembled machine room Price Introduction! In recent years, the speed of economic development in China has risen straightly, and GDP is in a steady growth state, which shows that people's living standards are constantly improving. But for the utilization of water resources, people generally have the deep-rooted idea of inexhaustible, which leads to the increasing waste and pollution of water resources. However, at present, the development of urban industrial production has increased the utilization of water resources, so the supply of fresh water resources has presented a shortage problem. In addition, the urban industrial development has aggravated the sewage problem, and the urban sewage problem has gradually become the primary factor threatening the normal development of the city and affecting the urban ecology. Compared with the western developed countries, China's water pollution treatment technology is relatively backward. We must learn from the advanced means and technologies of water pollution treatment in western developed countries, and explore a water pollution treatment road with Chinese characteristics in combination with China's own water pollution treatment status. There may be many problems in the process of exploration, but we must continue to improve and gradually improve the efficiency of water pollution treatment. In many cases, the speed of sewage treatment in China lags far behind the speed of water pollution, while high energy consumption increases the economic load, coupled with the low degree of automation of water pollution equipment, resulting in excessive labor consumption, which will cause difficulties in water pollution treatment in China.

 Recommended price of prefabricated machine room in Xuzhou

recommend Assembled machine room What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Assembled machine room Price Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.

 Recommended price of prefabricated machine room in Xuzhou

recommend Assembled machine room It is a new type of sewage and rainwater integrated automatic collection and lifting system, Assembled machine room Price It is an integrated pump station in a sense. The barrel body of the pump station is made of advanced materials, such as reinforced glass fiber or polyethylene resin for automatic casting. The internal water pump, pipeline, valve, instrument, control equipment, ladder and other accessories required by the user can be provided by Philippine Source in a complete set and delivered after installation and commissioning. He can even bring maintenance room and power grid, which is a new kind of integrated pump station equipment, easy to use, reliable quality, less civil work and low cost. High integration and volume optimization are the remarkable characteristics of the pump station, which are the substitutes for the traditional small and medium-sized concrete pump stations.

Share to