large Mobile machine room What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Mobile machine room Manufacturer Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.
large Mobile machine room "Good, fast and economical" Talking about the advantages of prefabricated pump house, Mobile machine room Manufacturer He said, "First of all, the quality of prefabricated concrete components is controllable, the deviation of appearance surface flatness is small, and the concrete strength of prefabricated products can reach C40, which is conducive to improving the instability of concrete quality of traditional cast-in-place structures; Secondly, the construction period is controllable. Prefabricated components are produced in factories, and on-site installation is mechanically hoisted, which is safe and convenient, and can also significantly reduce the use of labor. The project duration can be free from the impact of natural weather and other factors; The third is energy conservation and environmental protection. The main body of the project is mostly prefabricated, and a large number of cement, sand and stone and other dust building materials do not need to enter the site. The construction has little impact on the surrounding urban environment. " The prefabricated steel structure building is a form of prefabricated building with high assembly rate, which covers the components of the system such as structure, enclosure, interior decoration and equipment pipeline. It is prefabricated in the factory, and the integrated module is transported to the construction site for assembly and connection to form a complete building. Fabricated steel structure buildings have the advantages of high standardization and high integration, which can greatly reduce the entire construction cycle.
1. To ensure the safety of the pump room, the pump room must be locked. 2、 Mobile machine room Manufacturer Safety Operation Regulations, Hygiene and Safety Management System for Secondary Water Supply, Patrol Inspection Specifications, Water Quality Inspection Record System must be posted inside. 3 large Mobile machine room There must be the following record documents inside: Patrol Inspection Record, Water Tank Blowdown Record, Disinfection Record, Water Quality Inspection Record. 4. The pump room must be marked with the pressurized area, and the corresponding control system should also be marked with the pressurized area: low area, middle area, high area, etc, Mark the product model, qualified number, ex factory date, etc. 6. Water pump identification: the number of pumps must be painted on each pump; For example: 1 # pump, 2 # pump, 3 # pump, 4 # pump, 5 # pump, words. 7. "Normally open" signboard of inlet and outlet valves; 8. The pipe shall be marked with water flow direction arrow; 9. The prefabricated energy-saving pump room needs a drainage system 10. The energy-saving pump room can realize on-site control and remote monitoring;
large Mobile machine room Operation and maintenance of the lifting pump station: 1. The operation management mode of the comprehensive sewage pump station includes the self management of the construction unit, the agent management of the equipment supplier, the centralized entrusted operation, and the self management of farmers. The appropriate mode can be selected according to the specific situation. 2. The design or construction unit of the sewage lift pump station shall train the operation management personnel after the completion acceptance and before the formal delivery of the project, and timely deliver the construction data and system operation management requirements together. 3. The operation and management personnel of the integrated pump station shall be familiar with the operation requirements, technical indicators and safe operation procedures of the treatment process, facilities and equipment, etc., patrol and inspect the operation of the sewage treatment facilities as required, and make operation records in a timely manner. 4. The operation management personnel of the pump station shall regularly maintain, check and clean the relevant equipment to prevent equipment failures and ensure the normal operation of the facilities. five Mobile machine room Manufacturer Timely master the water quality of the treatment system to ensure that the water quality meets the standard; If the water quality is not up to the standard, find and solve the problem in time.
large Mobile machine room Talking about why the country should vigorously promote smart water, Mobile machine room Manufacturer How to build a smart pump house? The four ministries and commissions of the country put forward safeguard measures and requirements on improving and improving the construction and management of secondary water supply infrastructure for urban residents to ensure water quality safety, requiring that the construction and management of secondary water supply infrastructure should be improved and improved in all aspects to ensure the scientific planning and construction of secondary water supply infrastructure and promote the systematic operation and maintenance of secondary water supply infrastructure. Promote the formation of a new pattern of secondary water supply infrastructure construction and management with clear rights and responsibilities, professional management and adequate supervision, and solve the water quality safety problem of "one kilometer after the urban water supply".
large Mobile machine room Look at the trend of future architectural situation? Mobile machine room Manufacturer Let's talk about it: the house is a place for people to shelter from wind and rain at the beginning, but with the development of society and the improvement of living standards, people continue to pursue a comfortable living environment. While improving the construction level, they install various heating and cooling equipment to solve the problem of heating and cooling, and install fresh air and humidity control equipment to solve the problem of indoor ventilation and humidity. At present, the comfort of the house has reached the standard of constant temperature, humidity, oxygen and cleanliness. However, the energy consumption of buildings has been increasing, accounting for 30-40% of the total energy consumption of the society, resulting in an energy crisis, and the environment is getting worse and worse, which seriously affects the sustainable development of society. How can we not only meet the requirements of living comfort today, but also fundamentally reduce energy consumption? This is a subject that has been studied all over the world.