新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Recommended price of automatic control equipment in Yancheng

2020-08-28
 Recommended price of automatic control equipment in Yancheng

recommend Automatic control equipment Operation and maintenance of the lifting pump station: 1. The operation management mode of the comprehensive sewage pump station includes the self management of the construction unit, the agent management of the equipment supplier, the centralized entrusted operation, and the self management of farmers. The appropriate mode can be selected according to the specific situation. 2. The design or construction unit of the sewage lift pump station shall train the operation management personnel after the completion acceptance and before the formal delivery of the project, and timely deliver the construction data and system operation management requirements together. 3. The operation and management personnel of the integrated pump station shall be familiar with the operation requirements, technical indicators and safe operation procedures of the treatment process, facilities and equipment, etc., patrol and inspect the operation of the sewage treatment facilities as required, and make operation records in a timely manner. 4. The operation management personnel of the pump station shall regularly maintain, check and clean the relevant equipment to prevent equipment failures and ensure the normal operation of the facilities. five Automatic control equipment Price Timely master the water quality of the treatment system to ensure that the water quality meets the standard; If the water quality is not up to the standard, find and solve the problem in time.

 Recommended price of automatic control equipment in Yancheng

recommend Automatic control equipment Function. It is mainly used in the construction of sponge cities such as flood control and drainage, river restoration, black and smelly water treatment, rainwater collection and utilization. Automatic control equipment Price It is suitable for living quarters, rural areas, municipal pipe networks, office buildings, shopping malls, streets, hotels, hotels, restaurants, sanatoriums, organs, schools, troops, highways, airports, railways, subway stations, stations, factories, mines, tourist attractions and other domestic sewage and similar slaughtering, paper mills, aquatic product processing Treatment and reuse of organic wastewater from small and medium-sized industries such as food processing plants.

 Recommended price of automatic control equipment in Yancheng

recommend Automatic control equipment As the underground installation is adopted, it can be directly installed around the residential area, and because of its small floor area, the characteristics of the whole underground installation will not affect the lives of residents. The harmony and unity with the surrounding environment can be achieved through the landscape control room above the ground. Automatic control equipment Price It is used in places that cannot rely on gravity to discharge sewage by itself. Waste water below the water level of the waterway is collected through the sewage tank, as well as waste water discharged far away from the municipal sewage pipe network and sanitary facilities, and sewage is transported to the sewage pipe network with the help of the sewage pump.

 Recommended price of automatic control equipment in Yancheng

In recent years, with the construction of more and more pump houses around the country, problems related to them have become increasingly apparent, Automatic control equipment Price Management and maintenance, water pollution, safety management and other issues are gradually exposed. How to further strengthen the management level of the above pump room facilities and equipment, further improve and ensure the safe water supply capacity, and manage and maintain all kinds of facilities and equipment in the pump room has become the common concern and work direction of all major water supply management enterprises and water supply equipment manufacturers. Standardized standard pump room construction and management introduced, recommend Automatic control equipment Mainly based on the optimized configuration and construction of various facilities and equipment in the pump room, the computer network information technology is used to organically integrate various nodes in the pump room. At the same time, in combination with the local economic construction level, according to the actual situation and budget needs of the project, a reasonable standardized construction, management and maintenance scheme is provided and implemented for various pump rooms. Its core is the safe full frequency conversion control pressurization equipment, followed by the integration of computer network information system, and the safety management and maintenance of the whole life cycle.

 Recommended price of automatic control equipment in Yancheng

recommend Automatic control equipment What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Automatic control equipment Price Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.

Share to