large Horizontal end suction pump Operation and maintenance of the lifting pump station: 1. The operation management mode of the comprehensive sewage pump station includes the self management of the construction unit, the agent management of the equipment supplier, the centralized entrusted operation, and the self management of farmers. The appropriate mode can be selected according to the specific situation. 2. The design or construction unit of the sewage lift pump station shall train the operation management personnel after the completion acceptance and before the formal delivery of the project, and timely deliver the construction data and system operation management requirements together. 3. The operation and management personnel of the integrated pump station shall be familiar with the operation requirements, technical indicators and safe operation procedures of the treatment process, facilities and equipment, etc., patrol and inspect the operation of the sewage treatment facilities as required, and make operation records in a timely manner. 4. The operation management personnel of the pump station shall regularly maintain, check and clean the relevant equipment to prevent equipment failures and ensure the normal operation of the facilities. five Horizontal end suction pump Price Timely master the water quality of the treatment system to ensure that the water quality meets the standard; If the water quality is not up to the standard, find and solve the problem in time.
large Horizontal end suction pump It is an important water conservancy equipment in urban infrastructure construction, Horizontal end suction pump Price It is mainly used for municipal drainage, flood control and waterlogging drainage in flood season, and can be divided into sewage lift pump station and rainwater lift pump station according to the action objects. It is generally installed underground and connected with the urban underground sewage pipe network to collect domestic sewage and rainwater. It is a new environment-friendly pump station. After the mixing treatment, the water level is raised by pressurizing the water pump, and the sewage is transported to the sewage treatment plant, realizing the rapid discharge and treatment of urban sewage.
Horizontal end suction pump Price Introduce the basic structure of the integrated pump station: 1 large Horizontal end suction pump The GRP glass fiber reinforced plastic cylinder is made of GRP glass fiber reinforced plastic, and the process is continuous mechanical winding. It is characterized by firmness, durability, non leakage, corrosion resistance, and a service life of 50 years. 2. The base is made of GRP glass fiber reinforced plastic, and the process is molding. It is characterized by anti clogging, anti floating and anti sinking, and its service life can also reach 50 years. 3. The top cover is generally made of embossed aluminum plate, or stainless steel, glass fiber reinforced plastic and other materials, which is used for personnel access. 4. Handrails are made of 304 stainless steel or 316 stainless steel. 5. The control cabinet can be made of 304 stainless steel or 316 stainless steel, which is the core of intelligent control. 6. The flange is made of 304 stainless steel. 7. Check valve, with various stainless steel materials, such as 304, 201, 316, etc. 8. Gate valve is made of 304 stainless steel, or 201, 316, etc. 9. The grating support is made of 304 stainless steel. Similarly, 316 stainless steel can also be selected.
large Horizontal end suction pump What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Horizontal end suction pump Price Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.