新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Xinyang supplies manufacturers of ordinary vertical centrifugal pumps

2020-09-01
 Xinyang supplies manufacturers of ordinary vertical centrifugal pumps

Users also have this problem again. First of all, we should know the composition of the pump station. ad locum, Ordinary vertical centrifugal pump Manufacturer The pump set is divided into three parts. Main body of pump unit, external control equipment and internal equipment. First, we should select the wall thickness of the pump unit cylinder according to the actual demand. The factors to be considered here include: geology, temperature, working environment of pump unit, altitude, etc. Therefore, the selection of pump unit cylinder wall thickness should be summarized and considered. The wall thickness directly affects the firmness of the pump set. Of course, the selection of internal equipment is also important. During this period, the selection of submersible sewage pump is important. Here, the selection of flow head of submersible sewage pump is important. supply Ordinary vertical centrifugal pump The flow head of submersible sewage pump shall be selected according to the actual situation. There are many types of submersible sewage pumps. For example, 200 in front of 200WQ300-7-15 refers to the diameter, WQ refers to the pump type, and 300 refers to the flow of 300m ³/ h. 7 refers to the lift of 7m, and 15 refers to the power of this submersible pump of 15KW.

 Xinyang supplies manufacturers of ordinary vertical centrifugal pumps

supply Ordinary vertical centrifugal pump Talking about why the country should vigorously promote smart water, Ordinary vertical centrifugal pump Manufacturer How to build a smart pump house? The four ministries and commissions of the country put forward safeguard measures and requirements on improving and improving the construction and management of secondary water supply infrastructure for urban residents to ensure water quality safety, requiring that the construction and management of secondary water supply infrastructure should be improved and improved in all aspects to ensure the scientific planning and construction of secondary water supply infrastructure and promote the systematic operation and maintenance of secondary water supply infrastructure. Promote the formation of a new pattern of secondary water supply infrastructure construction and management with clear rights and responsibilities, professional management and adequate supervision, and solve the water quality safety problem of "one kilometer after the urban water supply".

 Xinyang supplies manufacturers of ordinary vertical centrifugal pumps

1. To ensure the safety of the pump room, the pump room must be locked. 2、 Ordinary vertical centrifugal pump Manufacturer Safety Operation Regulations, Hygiene and Safety Management System for Secondary Water Supply, Patrol Inspection Specifications, Water Quality Inspection Record System must be posted inside. 3 supply Ordinary vertical centrifugal pump There must be the following record documents inside: Patrol Inspection Record, Water Tank Blowdown Record, Disinfection Record, Water Quality Inspection Record. 4. The pump room must be marked with the pressurized area, and the corresponding control system should also be marked with the pressurized area: low area, middle area, high area, etc, Mark the product model, qualified number, ex factory date, etc. 6. Water pump identification: the number of pumps must be painted on each pump; For example: 1 # pump, 2 # pump, 3 # pump, 4 # pump, 5 # pump, words. 7. "Normally open" signboard of inlet and outlet valves; 8. The pipe shall be marked with water flow direction arrow; 9. The prefabricated energy-saving pump room needs a drainage system 10. The energy-saving pump room can realize on-site control and remote monitoring;

 Xinyang supplies manufacturers of ordinary vertical centrifugal pumps

supply Ordinary vertical centrifugal pump As the underground installation is adopted, it can be directly installed around the residential area, and because of its small floor area, the characteristics of the whole underground installation will not affect the lives of residents. The harmony and unity with the surrounding environment can be achieved through the landscape control room above the ground. Ordinary vertical centrifugal pump Manufacturer It is used in places that cannot rely on gravity to discharge sewage by itself. Waste water below the water level of the waterway is collected through the sewage tank, as well as waste water discharged far away from the municipal sewage pipe network and sanitary facilities, and sewage is transported to the sewage pipe network with the help of the sewage pump.

 Xinyang supplies manufacturers of ordinary vertical centrifugal pumps

supply Ordinary vertical centrifugal pump What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Ordinary vertical centrifugal pump Manufacturer Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.

Share to