Integrated sewage pump set Price It is a new electromechanical integrated water supply equipment composed of computer technology, frequency conversion technology and motor pump, to meet the requirements of urban water supply network that water pumping does not produce negative pressure, but also has a certain capacity of regulation and storage, and water supply is cut off during peak periods. Scope of application of integrated pump set: 1. Scope of application: it is applicable to pressurized water supply in areas with sufficient urban pipe network pressure. 2. Applicable project type: large intermediate booster pump station for production and domestic water of industrial and mining enterprises, and water supply of waterworks. 3、 supply Integrated sewage pump set Applicable project position: water supply secondary pressurization system. 4. Other scope of application: domestic water for new, reconstructed and expanded residential buildings, office buildings, hotels, restaurants and other public buildings. 5. Type of using unit: design unit, construction unit and supervision unit.
supply Integrated sewage pump set What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Integrated sewage pump set Price Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.
Integrated sewage pump set Price General provisions: equipment discharging heat, steam or harmful substances, supply Integrated sewage pump set Local exhaust should be adopted. When local ventilation can not be used or local ventilation can not meet the health requirements, it shall be supplemented with all-round ventilation or adopt all-round ventilation. The air distribution design shall be optimized according to the characteristics and changes of pollutants, and the normal operation of local exhaust system shall not be damaged. At the same time, when releasing waste heat, moisture and harmful substances, the ventilation volume in all aspects shall be determined according to the large air volume required. When the quantity of harmful substances cannot be determined, the ventilation volume in all aspects can be determined according to the ventilation frequency. All kinds of pump rooms in the domestic sewage treatment station should adopt natural ventilation. When mechanical ventilation is adopted, indoor air should not be recycled. All pump rooms in the oily sewage treatment station should adopt natural ventilation. When mechanical ventilation is adopted, indoor air should not be recycled, and the ventilator and motor should be explosion-proof and directly connected.
Compared with traditional pump stations, Integrated sewage pump set Price The required installation and commissioning time is greatly reduced. supply Integrated sewage pump set The existing integrated sewage pump station is technically improved, and private customization is provided. In addition, why is the price of qualified fire pump not expensive? The correct fire pump manufacturers, especially those with full qualifications and years of experience, are first of all professional enough in production technology. The working procedures of the system machine, submersible sewage pump and other main control equipment are fed into the PLC machine to achieve automatic operation, so as to reduce the operating workload and reduce unnecessary human damage. The ground occupies only a few square meters, so space is saved. Precautions when selecting comprehensive sewage pump station, remember! The sewage comprehensive pump station has a great impact on sewage treatment, and is a favorite sewage treatment product of many units and enterprises.
Integrated sewage pump set Price The integrated prefabricated pump station is a comprehensive urban drainage and water supply device that provides potential energy and pressure energy for water. It is composed of cylinders, pipelines, electromechanical equipment, electrical control and other ancillary facilities, and is scientifically matched, reasonably designed and assembled. Its drainage performance, safety performance and operation reliability directly determine the safety of urban drainage and water supply. supply Integrated sewage pump set The demander's requirements for its performance are also getting higher and higher, so detection is the way to obtain the demander's approval.
supply Integrated sewage pump set How to choose? Integrated sewage pump set Price The main equipment in the pump station selected according to the input and output are: various controllable valves, pump sets, grid systems, water level gauges, flow meters, etc. According to the requirements of the system and the different control methods adopted, as well as the nature, parameters and characteristics of the input and output signals, the appropriate PLC system can be flexibly selected. Select according to the storage capacity Calculate the actual capacity demand of the storage according to the number of nodes required for programming. The PLC control system used in the current pump station is selected according to the communication requirements, which is generally divided into equipment unit layer, pump station layer, dispatching layer, etc. Layers directly need to transmit various parameter information, so we should select the appropriate PLC equipment according to the field needs, such as network, expansion, off the shelf bus connection, investment and our own equipment.