supply Integrated sewage pump set "Good, fast and economical" Talking about the advantages of prefabricated pump house, Integrated sewage pump set manufactor He said, "First of all, the quality of prefabricated concrete components is controllable, the deviation of appearance surface flatness is small, and the concrete strength of prefabricated products can reach C40, which is conducive to improving the instability of concrete quality of traditional cast-in-place structures; Secondly, the construction period is controllable. Prefabricated components are produced in factories, and on-site installation is mechanically hoisted, which is safe and convenient, and can also significantly reduce the use of labor. The project duration can be free from the impact of natural weather and other factors; The third is energy conservation and environmental protection. The main body of the project is mostly prefabricated, and a large number of cement, sand and stone and other dust building materials do not need to enter the site. The construction has little impact on the surrounding urban environment. " The prefabricated steel structure building is a form of prefabricated building with high assembly rate, which covers the components of the system such as structure, enclosure, interior decoration and equipment pipeline. It is prefabricated in the factory, and the integrated module is transported to the construction site for assembly and connection to form a complete building. Fabricated steel structure buildings have the advantages of high standardization and high integration, which can greatly reduce the entire construction cycle.
supply Integrated sewage pump set Noise includes pump noise, motor noise and pipeline noise. There is no staff in the assembled pump room during the normal operation of the pump, so the main purpose is to protect the residents around the pump room from being affected. The pump house is mostly used in the basement of residential buildings, Integrated sewage pump set manufactor During operation, the vibration noise of the pump unit spreads along the floor and wall to the upstairs, resulting in obvious vibration of the wall, floor, ceiling and column head of the owner's room upstairs. The room buzz has a serious impact on the human body. Many cities in the north need heating in winter, so many communities have set up heating pump rooms. Ventilation and heat dissipation are required in the pump room, and sound leakage is serious when the pump is running. There will be a high noise sound pressure level outside the pump room, which will seriously affect the quality of life and sleep of residents in the community.
Integrated sewage pump set manufactor General provisions: equipment discharging heat, steam or harmful substances, supply Integrated sewage pump set Local exhaust should be adopted. When local ventilation can not be used or local ventilation can not meet the health requirements, it shall be supplemented with all-round ventilation or adopt all-round ventilation. The air distribution design shall be optimized according to the characteristics and changes of pollutants, and the normal operation of local exhaust system shall not be damaged. At the same time, when releasing waste heat, moisture and harmful substances, the ventilation volume in all aspects shall be determined according to the large air volume required. When the quantity of harmful substances cannot be determined, the ventilation volume in all aspects can be determined according to the ventilation frequency. All kinds of pump rooms in the domestic sewage treatment station should adopt natural ventilation. When mechanical ventilation is adopted, indoor air should not be recycled. All pump rooms in the oily sewage treatment station should adopt natural ventilation. When mechanical ventilation is adopted, indoor air should not be recycled, and the ventilator and motor should be explosion-proof and directly connected.
Integrated sewage pump set manufactor It is a new electromechanical integrated water supply equipment composed of computer technology, frequency conversion technology and motor pump, to meet the requirements of urban water supply network that water pumping does not produce negative pressure, but also has a certain capacity of regulation and storage, and water supply is cut off during peak periods. Scope of application of integrated pump set: 1. Scope of application: it is applicable to pressurized water supply in areas with sufficient urban pipe network pressure. 2. Applicable project type: large intermediate booster pump station for production and domestic water of industrial and mining enterprises, and water supply of waterworks. 3、 supply Integrated sewage pump set Applicable project position: water supply secondary pressurization system. 4. Other scope of application: domestic water for new, reconstructed and expanded residential buildings, office buildings, hotels, restaurants and other public buildings. 5. Type of using unit: design unit, construction unit and supervision unit.
supply Integrated sewage pump set What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Integrated sewage pump set manufactor Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.