large Horizontal energy-saving end suction pump What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Horizontal energy-saving end suction pump Price Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.
large Horizontal energy-saving end suction pump In the design, there is no such statement as main pump and standby pump. Our statement is that one is in use and one is standby or two is in use and one is standby. They are standby for each other and used in turn. When one is running, the other is the standby pump. Horizontal energy-saving end suction pump Price The first reason for setting a standby pump is to ensure that when the pump is damaged or overhauled, there is still a pump that can work, rather than that we can't use water as long as the pump is broken or regularly overhauled. The second is to let the pump take turns to rest after working for a period of time. To prevent long-term continuous operation from affecting the normal service life of the pump.
Horizontal energy-saving end suction pump Price It is a new electromechanical integrated water supply equipment composed of computer technology, frequency conversion technology and motor pump, to meet the requirements of urban water supply network that water pumping does not produce negative pressure, but also has a certain capacity of regulation and storage, and water supply is cut off during peak periods. Scope of application of integrated pump set: 1. Scope of application: it is applicable to pressurized water supply in areas with sufficient urban pipe network pressure. 2. Applicable project type: large intermediate booster pump station for production and domestic water of industrial and mining enterprises, and water supply of waterworks. 3、 large Horizontal energy-saving end suction pump Applicable project position: water supply secondary pressurization system. 4. Other scope of application: domestic water for new, reconstructed and expanded residential buildings, office buildings, hotels, restaurants and other public buildings. 5. Type of using unit: design unit, construction unit and supervision unit.
Compared with traditional pump stations, Horizontal energy-saving end suction pump Price The required installation and commissioning time is greatly reduced. large Horizontal energy-saving end suction pump The existing integrated sewage pump station is technically improved, and private customization is provided. In addition, why is the price of qualified fire pump not expensive? The correct fire pump manufacturers, especially those with full qualifications and years of experience, are first of all professional enough in production technology. The working procedures of the system machine, submersible sewage pump and other main control equipment are fed into the PLC machine to achieve automatic operation, so as to reduce the operating workload and reduce unnecessary human damage. The ground occupies only a few square meters, so space is saved. Precautions when selecting comprehensive sewage pump station, remember! The sewage comprehensive pump station has a great impact on sewage treatment, and is a favorite sewage treatment product of many units and enterprises.