新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Price of integrated pump set for sewage supply in Puyang

2020-11-20
 Price of integrated pump set for sewage supply in Puyang

supply Integrated sewage pump set It is an important water conservancy equipment in urban infrastructure construction, Integrated sewage pump set Price It is mainly used for municipal drainage, flood control and waterlogging drainage in flood season, and can be divided into sewage lift pump station and rainwater lift pump station according to the action objects. It is generally installed underground and connected with the urban underground sewage pipe network to collect domestic sewage and rainwater. It is a new environment-friendly pump station. After the mixing treatment, the water level is raised by pressurizing the water pump, and the sewage is transported to the sewage treatment plant, realizing the rapid discharge and treatment of urban sewage.

 Price of integrated pump set for sewage supply in Puyang

supply Integrated sewage pump set It is not only reflected in its working ability, but also in its excellent manufacturing process and maintenance costs. The integrated prefabricated pump station is highly integrated, so its volume is very small. It is a good choice for sewage treatment equipment for some factories and business districts that do not have a shortage of land. In addition, Integrated sewage pump set Price The degree of intelligence is very high, so its failure rate is very low. Combined with the application of anti blocking technology, the integrated prefabricated pump station becomes very convenient in the later use, which greatly reduces the labor cost and maintenance cost.

 Price of integrated pump set for sewage supply in Puyang

supply Integrated sewage pump set "Good, fast and economical" Talking about the advantages of prefabricated pump house, Integrated sewage pump set Price He said, "First of all, the quality of prefabricated concrete components is controllable, the deviation of appearance surface flatness is small, and the concrete strength of prefabricated products can reach C40, which is conducive to improving the instability of concrete quality of traditional cast-in-place structures; Secondly, the construction period is controllable. Prefabricated components are produced in factories, and on-site installation is mechanically hoisted, which is safe and convenient, and can greatly reduce the use of labor. The project duration can be free from the impact of natural weather and other factors; The third is energy conservation and environmental protection. The main body of the project is mostly prefabricated, and a large number of cement, sand and stone and other dust building materials do not need to enter the site. The construction has little impact on the surrounding urban environment. " The prefabricated steel structure building is a form of prefabricated building with high assembly rate, which covers the components of the system such as structure, enclosure, interior decoration and equipment pipeline. It is prefabricated in the factory, and the integrated module is transported to the construction site for assembly and connection to form a complete building. Fabricated steel structure buildings have the advantages of high standardization and high integration, which can greatly reduce the entire construction cycle.

 Price of integrated pump set for sewage supply in Puyang

1. To ensure the safety of the pump room, the pump room must be locked. 2、 Integrated sewage pump set Price Safety Operation Regulations, Hygiene and Safety Management System for Secondary Water Supply, Patrol Inspection Specifications, Water Quality Inspection Record System must be posted inside. 3 supply Integrated sewage pump set The following record files must be available inside: Patrol Inspection Record, Water Tank Blowdown Record, Disinfection Record, Water Quality Inspection Record. 4. The pump room must have a pressurized area mark, and the corresponding control system should also have a pressurized area mark: low area, middle area, high area, etc, Mark the product model, qualified number, ex factory date, etc. 6. Water pump identification: the number of pumps must be painted on each pump; For example: 1 # pump, 2 # pump, 3 # pump, 4 # pump, 5 # pump, words. 7. "Normally open" signboard of inlet and outlet valves; 8. The pipe shall be marked with water flow direction arrow; 9. The prefabricated energy-saving pump room needs a drainage system 10. The energy-saving pump room can realize on-site control and remote monitoring;

Share to