新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Shaoxing recommends manufacturers of HVAC integrated pump sets

2020-11-28
 Shaoxing recommends manufacturers of HVAC integrated pump sets

recommend HVAC integrated pump set Application in water supply and drainage engineering, HVAC integrated pump set Manufacturer Introduction! In recent years, the speed of economic development in China has risen straightly, and GDP is in a steady growth state, which shows that people's living standards are constantly improving. But for the utilization of water resources, people generally have the deep-rooted idea of inexhaustible, which leads to the increasing waste and pollution of water resources. However, at present, the development of urban industrial production has increased the utilization of water resources, so the supply of fresh water resources has presented a shortage problem. In addition, the urban industrial development has aggravated the sewage problem, and the urban sewage problem has gradually become the primary factor threatening the normal development of the city and affecting the urban ecology. Compared with the western developed countries, China's water pollution treatment technology is relatively backward. We must learn from the advanced means and technologies of water pollution treatment in western developed countries, and explore a water pollution treatment road with Chinese characteristics in combination with China's own water pollution treatment status. There may be many problems in the process of exploration, but we must continue to improve and gradually improve the efficiency of water pollution treatment. In many cases, the speed of sewage treatment in China lags far behind the speed of water pollution, while high energy consumption increases the economic load, coupled with the low degree of automation of water pollution equipment, resulting in excessive labor consumption, which will cause difficulties in water pollution treatment in China.

 Shaoxing recommends manufacturers of HVAC integrated pump sets

recommend HVAC integrated pump set In the design, there is no such statement as main pump and standby pump. Our statement is that one is in use and one is standby or two is in use and one is standby. They are standby for each other and used in turn. When one is running, the other is the standby pump. HVAC integrated pump set Manufacturer The first reason for setting a standby pump is to ensure that when the pump is damaged or overhauled, there is still a pump that can work, rather than that we can't use water as long as the pump is broken or regularly overhauled. The second is to let the pump take turns to rest after working for a period of time. To prevent long-term continuous operation from affecting the normal service life of the pump.

 Shaoxing recommends manufacturers of HVAC integrated pump sets

recommend HVAC integrated pump set What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three HVAC integrated pump set Manufacturer Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.

 Shaoxing recommends manufacturers of HVAC integrated pump sets

HVAC integrated pump set Manufacturer Introduce the basic structure of the integrated pump station: 1 recommend HVAC integrated pump set The GRP glass fiber reinforced plastic cylinder is made of GRP glass fiber reinforced plastic, and the process is continuous mechanical winding. It is characterized by firmness, durability, non leakage, corrosion resistance, and a service life of 50 years. 2. The base is made of GRP glass fiber reinforced plastic, and the process is molding. It is characterized by anti clogging, anti floating and anti sinking, and its service life can also reach 50 years. 3. The top cover is generally made of embossed aluminum plate, or stainless steel, glass fiber reinforced plastic and other materials, which is used for personnel access. 4. Handrails are made of 304 stainless steel or 316 stainless steel. 5. The control cabinet can be made of 304 stainless steel or 316 stainless steel, which is the core of intelligent control. 6. The flange is made of 304 stainless steel. 7. Check valve, with various stainless steel materials, such as 304, 201, 316, etc. 8. Gate valve is made of 304 stainless steel, or 201, 316, etc. 9. The grating support is made of 304 stainless steel. Similarly, 316 stainless steel can also be selected.

 Shaoxing recommends manufacturers of HVAC integrated pump sets

recommend HVAC integrated pump set It is not only reflected in its working ability, but also in its excellent manufacturing process and maintenance costs. The integrated prefabricated pump station is highly integrated, so its volume is very small. It is a good choice for sewage treatment equipment for some factories and business districts that do not have a shortage of land. In addition, HVAC integrated pump set Manufacturer The degree of intelligence is very high, so its failure rate is very low. Combined with the application of anti blocking technology, the integrated prefabricated pump station becomes very convenient in the later use, which greatly reduces the labor cost and maintenance cost.

 Shaoxing recommends manufacturers of HVAC integrated pump sets

recommend HVAC integrated pump set Talking about why the country should vigorously promote smart water, HVAC integrated pump set Manufacturer How to build a smart pump house? The four ministries and commissions of the country put forward safeguard measures and requirements on improving and improving the construction and management of secondary water supply infrastructure for urban residents to ensure water quality safety, requiring that the construction and management of secondary water supply infrastructure should be improved and improved in all aspects to ensure the scientific planning and construction of secondary water supply infrastructure and promote the systematic operation and maintenance of secondary water supply infrastructure. Promote the formation of a new pattern of secondary water supply infrastructure construction and management with clear rights and responsibilities, professional management and adequate supervision, and solve the water quality safety problem of "one kilometer after the urban water supply".

Share to