1. To ensure the safety of the pump room, the pump room must be locked. 2、 HVAC integrated pump set Manufacturer Safety Operation Regulations, Hygiene and Safety Management System for Secondary Water Supply, Patrol Inspection Specifications, Water Quality Inspection Record System must be posted inside. 3 recommend HVAC integrated pump set The following record files must be available inside: Patrol Inspection Record, Water Tank Blowdown Record, Disinfection Record, Water Quality Inspection Record. 4. The pump room must have a pressurized area mark, and the corresponding control system should also have a pressurized area mark: low area, middle area, high area, etc, Mark the product model, qualified number, ex factory date, etc. 6. Water pump identification: the number of pumps must be painted on each pump; For example: 1 # pump, 2 # pump, 3 # pump, 4 # pump, 5 # pump, words. 7. "Normally open" signboard of inlet and outlet valves; 8. The pipe shall be marked with water flow direction arrow; 9. The prefabricated energy-saving pump room needs a drainage system 10. The energy-saving pump room can realize on-site control and remote monitoring;
HVAC integrated pump set Manufacturer The design principle is: (1) The overall layout should be reasonable, especially for the pump stations that combine irrigation and drainage or self drainage, self diversion and water lifting, as well as the pump stations that combine gates and stations, the layout should be as compact as possible, making full use of buildings for regulation. (2) The selection of pump type shall strive to make the design head of the pump station consistent with the rated head of the pump, and meet the requirements of irrigation and drainage flow. The pump type with advanced technology shall be selected as far as possible to ensure high efficiency of the pump station device and low operation cost. At the same time, the selected pump type should be relatively mature, with certain operation practice, and the test pump type should be avoided as far as possible. (3) The selection of pump type shall fully consider the use and working nature of the integrated pump station. For irrigation and make-up water pump stations with long annual working hours, pumps with wide range, high efficiency and good cavitation performance shall be selected. For those pumping stations focusing on drainage, the pump type with reliable working performance and simple structure shall be selected. (4) The project layout shall adopt positive water inflow as far as possible to ensure that the water inflow condition of each unit is good and the flow pattern is uniform. recommend HVAC integrated pump set When lateral water inflow has to be adopted in the project layout, the distance between the lateral water inlet and the pump shall be extended as far as possible in the design, and certain diversion measures shall be taken. (5) The design of the outlet pool should try to avoid sharp bends that cause water impact and backwater. The pressure water tank shall be designed to avoid the increase of energy loss due to the mutual impact of water flow in each outlet pipe. (6) The construction materials available locally shall be used as far as possible. The design shall ensure simple and convenient construction and less project investment.
HVAC integrated pump set Manufacturer This paper introduces the advantages of the assembled steel structure building: 1. Standardization: standardization is the basis of modular construction. The standardization of module geometric size, connection mode, module combination form, internal parts, equipment and facilities is the basic guarantee to realize rapid and high-quality construction. 2. Modularization: all functional spaces are composed of modules with a high degree of standardization, which fully reflects the speed advantages brought by standardization and integration and meets the needs of emergency medical facilities construction. 3. Industrialization: the construction will be completed in a short time, and the designer will make full use of the existing module product size. While processing the floor on site, modules are produced synchronously in the factory. The factory environment and indoor construction conditions will ensure that its quality is easier to control and improve, defects are reduced, product reliability is improved, and production efficiency is high. 4. Assembling: the construction period on site is very short. In addition to wet operations such as floor leveling and foundation treatment, other parts of the site, such as equipment pipeline installation, door and window installation, indoor facilities installation, etc., are completely dry construction. Different types of work cross each other. Compared with traditional construction methods, it saves time, recommend HVAC integrated pump set Construction and decoration waste will also be reduced by about 70%.
recommend HVAC integrated pump set How to choose? HVAC integrated pump set Manufacturer The main equipment in the pump station selected according to the input and output are: various controllable valves, pump sets, grid systems, water level gauges, flow meters, etc. According to the requirements of the system and the different control methods adopted, as well as the nature, parameters and characteristics of the input and output signals, the appropriate PLC system can be flexibly selected. Select according to the storage capacity Calculate the actual capacity demand of the storage according to the number of nodes required for programming. The PLC control system used in the current pump station is selected according to the communication requirements, which is generally divided into equipment unit layer, pump station layer, dispatching layer, etc. Layers directly need to transmit various parameter information, so we should select the appropriate PLC equipment according to the field needs, such as network, expansion, off the shelf bus connection, investment and our own equipment.
recommend HVAC integrated pump set Look at the trend of future architectural situation? HVAC integrated pump set Manufacturer Let's talk about it: the house is a place for people to shelter from wind and rain at the beginning, but with the development of society and the improvement of living standards, people continue to pursue a comfortable living environment. While improving the construction level, they install various heating and cooling equipment to solve the problem of heating and cooling, and install fresh air and humidity control equipment to solve the problem of indoor ventilation and humidity. At present, the comfort of the house has reached the standard of constant temperature, humidity, oxygen and cleanliness. However, the energy consumption of buildings has been increasing, accounting for 30-40% of the total energy consumption of the society, resulting in an energy crisis, and the environment is getting worse and worse, which seriously affects the sustainable development of society. How can we not only meet the requirements of living comfort today, but also fundamentally reduce energy consumption? This is a subject that has been studied all over the world.
recommend HVAC integrated pump set What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three HVAC integrated pump set Manufacturer Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.