1、 Assembled machine room Manufacturer Location selection. large Assembled machine room It is the core part of the water supply and fire fighting pipe network of the whole building or the whole community, the plant area. The location of the pump room should be selected not only to facilitate the laying of water supply and fire fighting pipe network, but also not to have noise impact on rooms with quiet requirements. It should also try to minimize the occupancy of valuable buildings (such as shops and parking spaces). The domestic water supply pump room and fire pump room should be built together, which can not only save land, but also facilitate maintenance management. For a residential area, the pump room is often designed in the equipment room of the underground garage, and is combined with the generator room and other electrical and air-conditioning rooms in the same fire compartment. And the pump room should be as close as possible to the middle of the large water users or the whole community, which can reduce the length of the main pipe and reduce the head loss of the pipe network. The outlet of the pump room shall be directly connected to the outdoor or the emergency exit. If the pump house is located in a civil building, it should not be adjacent to the neighbor's house or on its upper or lower floors, and the pump house should be located in a well ventilated room without freezing. The size of the pump room is determined by the layout of the living pool, fire pool and pump set.
large Assembled machine room Operation and maintenance of the lifting pump station: 1. The operation management mode of the comprehensive sewage pump station includes the self management of the construction unit, the agent management of the equipment supplier, the centralized entrusted operation, and the self management of farmers. The appropriate mode can be selected according to the specific situation. 2. The design or construction unit of the sewage lift pump station shall train the operation management personnel after the completion acceptance and before the formal delivery of the project, and timely deliver the construction data and system operation management requirements together. 3. The operation and management personnel of the integrated pump station shall be familiar with the operation requirements, technical indicators and safe operation procedures of the treatment process, facilities and equipment, etc., patrol and inspect the operation of the sewage treatment facilities as required, and make operation records in a timely manner. 4. The operation management personnel of the pump station shall regularly maintain, check and clean the relevant equipment to prevent equipment failures and ensure the normal operation of the facilities. five Assembled machine room Manufacturer Timely master the water quality of the treatment system to ensure that the water quality meets the standard; If the water quality is not up to the standard, find and solve the problem in time.
large Assembled machine room Function. It is mainly used in the construction of sponge cities such as flood control and drainage, river restoration, black and smelly water treatment, rainwater collection and utilization. Assembled machine room Manufacturer It is suitable for living quarters, rural areas, municipal pipe networks, office buildings, shopping malls, streets, hotels, hotels, restaurants, sanatoriums, organs, schools, troops, highways, airports, railways, subway stations, stations, factories, mines, tourist attractions and other domestic sewage and similar slaughtering, paper mills, aquatic product processing Treatment and reuse of organic wastewater from small and medium-sized industries such as food processing plants.
large Assembled machine room How to choose? Assembled machine room Manufacturer The main equipment in the pump station selected according to the input and output are: various controllable valves, pump sets, grid systems, water level gauges, flow meters, etc. According to the requirements of the system and the different control methods adopted, as well as the nature, parameters and characteristics of the input and output signals, the appropriate PLC system can be flexibly selected. Select according to the storage capacity Calculate the actual capacity demand of the storage according to the number of nodes required for programming. The PLC control system used in the current pump station is selected according to the communication requirements, which is generally divided into equipment unit layer, pump station layer, dispatching layer, etc. Layers directly need to transmit various parameter information, so we should select the appropriate PLC equipment according to the field needs, such as network, expansion, off the shelf bus connection, investment and our own equipment.