新上海sh419

 Microwave ultraviolet water treatment equipment
Your current location: home page > Hot information

contact us Contact Us

Shandong Dehai Weilang Energy Equipment Co., Ltd

Contact: Mr. Wang

Tel.: 13001718597

Tel.: 0531-88551699

Email: [email protected]

Address: No. 6, Weihua West Road, Shizhong District, Jinan

Manufacturer of Yunfu integrated fire pump unit

2020-12-14
 Manufacturer of Yunfu integrated fire pump unit

1. To ensure the safety of the pump room, the pump room must be locked. 2、 Fire fighting integrated pump set Manufacturer Safety Operation Regulations, Hygiene and Safety Management System for Secondary Water Supply, Patrol Inspection Specifications, Water Quality Inspection Record System must be posted inside. 3 supply Fire fighting integrated pump set The following record files must be available inside: Patrol Inspection Record, Water Tank Blowdown Record, Disinfection Record, Water Quality Inspection Record. 4. The pump room must have a pressurized area mark, and the corresponding control system should also have a pressurized area mark: low area, middle area, high area, etc, Mark the product model, qualified number, ex factory date, etc. 6. Water pump identification: the number of pumps must be painted on each pump; For example: 1 # pump, 2 # pump, 3 # pump, 4 # pump, 5 # pump, words. 7. "Normally open" signboard of inlet and outlet valves; 8. The pipe shall be marked with water flow direction arrow; 9. The prefabricated energy-saving pump room needs a drainage system 10. The energy-saving pump room can realize on-site control and remote monitoring;

 Manufacturer of Yunfu integrated fire pump unit

Users also have this problem again. First of all, we should know the composition of the pump station. ad locum, Fire fighting integrated pump set Manufacturer The pump set is divided into three parts. Main body of pump unit, external control equipment and internal equipment. First, we should select the wall thickness of the pump unit cylinder according to the actual demand. The factors to be considered here include: geology, temperature, working environment of pump unit, altitude, etc. Therefore, the selection of pump unit cylinder wall thickness should be summarized and considered. The wall thickness directly affects the firmness of the pump set. Of course, the selection of internal equipment is also important. During this period, the selection of submersible sewage pump is important. Here, the selection of flow head of submersible sewage pump is important. supply Fire fighting integrated pump set The flow head of submersible sewage pump shall be selected according to the actual situation. There are many types of submersible sewage pumps. For example, 200 in front of 200WQ300-7-15 refers to the diameter, WQ refers to the pump type, and 300 refers to the flow of 300m ³/ h. 7 refers to the lift of 7m, and 15 refers to the power of this submersible pump of 15KW.

 Manufacturer of Yunfu integrated fire pump unit

Fire fighting integrated pump set Manufacturer The design principle is: (1) The overall layout should be reasonable, especially for the pump stations that combine irrigation and drainage or self drainage, self diversion and water lifting, as well as the pump stations that combine gates and stations, the layout should be as compact as possible, making full use of buildings for regulation. (2) The selection of pump type shall strive to make the design head of the pump station consistent with the rated head of the pump, and meet the requirements of irrigation and drainage flow. The pump type with advanced technology shall be selected as far as possible to ensure high efficiency of the pump station device and low operation cost. At the same time, the selected pump type should be relatively mature, with certain operation practice, and the test pump type should be avoided as far as possible. (3) The selection of pump type shall fully consider the use and working nature of the integrated pump station. For irrigation and make-up water pump stations with long annual working hours, pumps with wide range, high efficiency and good cavitation performance shall be selected. For those pumping stations focusing on drainage, the pump type with reliable working performance and simple structure shall be selected. (4) The project layout shall adopt positive water inflow as far as possible to ensure that the water inflow condition of each unit is good and the flow pattern is uniform. supply Fire fighting integrated pump set When lateral water inflow has to be adopted in the project layout, the distance between the lateral water inlet and the pump shall be extended as far as possible in the design, and certain diversion measures shall be taken. (5) The design of the outlet pool should try to avoid sharp bends that cause water impact and backwater. The pressure water tank shall be designed to avoid the increase of energy loss due to the mutual impact of water flow in each outlet pipe. (6) The construction materials available locally shall be used as far as possible. The design shall ensure simple and convenient construction and less project investment.

 Manufacturer of Yunfu integrated fire pump unit

supply Fire fighting integrated pump set "Good, fast and economical" Talking about the advantages of prefabricated pump house, Fire fighting integrated pump set Manufacturer He said, "First of all, the quality of prefabricated concrete components is controllable, the deviation of appearance surface flatness is small, and the concrete strength of prefabricated products can reach C40, which is conducive to improving the instability of concrete quality of traditional cast-in-place structures; Secondly, the construction period is controllable. Prefabricated components are produced in factories, and on-site installation is mechanically hoisted, which is safe and convenient, and can greatly reduce the use of labor. The project duration can be free from the impact of natural weather and other factors; The third is energy conservation and environmental protection. The main body of the project is mostly prefabricated, and a large number of cement, sand and stone and other dust building materials do not need to enter the site. The construction has little impact on the surrounding urban environment. " The prefabricated steel structure building is a form of prefabricated building with high assembly rate, which covers the components of the system such as structure, enclosure, interior decoration and equipment pipeline. It is prefabricated in the factory, and the integrated module is transported to the construction site for assembly and connection to form a complete building. Fabricated steel structure buildings have the advantages of high standardization and high integration, which can greatly reduce the entire construction cycle.

 Manufacturer of Yunfu integrated fire pump unit

supply Fire fighting integrated pump set What are the requirements for backfilling after installation? 1. Before backfilling, check that the pump station has not suffered structural damage. If yes, please contact our company as soon as possible and do not dispose of it by yourself! 2. After completing the installation and grouting of the pump station on the cement base plate and reaching the required strength, check that the structure is intact, and then backfill can be carried out. three Fire fighting integrated pump set Manufacturer Backfilling must be carried out in time after installation to prevent the pump station from floating and toppling, and the FRP material cannot be pulled or squeezed by force. 4.32mm plain soil can also be backfilled with graded sand and gravel, and the particle size of gravel shall not exceed 32mm. When the distance between the pump station barrel and the edge of the foundation pit is less than 1 m but more than 0.5 m, only graded sand and gravel can be used for backfilling, and the gravel particle size shall not exceed 32 mm. When backfilling in winter and rainy days, check whether the backfill materials are stuck together. The backfilling of the foundation pit shall be carried out continuously and completed as soon as possible. During the construction, the ground water shall be prevented from flowing into the foundation pit to avoid slope collapse or damage to the foundation soil. Backfilling shall be carried out in layers. The height difference of each layer shall not exceed 50cm. It shall be compacted with a tamper or manually, and the compaction shall be more than 90%.

 Manufacturer of Yunfu integrated fire pump unit

supply Fire fighting integrated pump set Operation and maintenance of the lifting pump station: 1. The operation management mode of the comprehensive sewage pump station includes the self management of the construction unit, the agent management of the equipment supplier, the centralized entrusted operation, and the self management of farmers. The appropriate mode can be selected according to the specific situation. 2. The design or construction unit of the sewage lift pump station shall train the operation management personnel after the completion acceptance and before the formal delivery of the project, and timely deliver the construction data and system operation management requirements together. 3. The operation and management personnel of the integrated pump station shall be familiar with the operation requirements, technical indicators and safe operation procedures of the treatment process, facilities and equipment, etc., patrol and inspect the operation of the sewage treatment facilities as required, and make operation records in a timely manner. 4. The operation management personnel of the pump station shall regularly maintain, check and clean the relevant equipment to prevent equipment failures and ensure the normal operation of the facilities. five Fire fighting integrated pump set Manufacturer Timely master the water quality of the treatment system to ensure that the water quality meets the standard; If the water quality is not up to the standard, find and solve the problem in time.

Share to