Boosting and stabilizing integrated pump set manufactor The design principle is: (1) The overall layout should be reasonable, especially for the pump stations that combine irrigation and drainage or self drainage, self diversion and water lifting, as well as the pump stations that combine gates and stations, the layout should be as compact as possible, making full use of buildings for regulation. (2) The selection of pump type shall strive to make the design head of the pump station consistent with the rated head of the pump, and meet the requirements of irrigation and drainage flow. The pump type with advanced technology shall be selected as far as possible to ensure high efficiency of the pump station device and low operation cost. At the same time, the selected pump type should be relatively mature, with certain operation practice, and the test pump type should be avoided as far as possible. (3) The selection of pump type shall fully consider the use and working nature of the integrated pump station. For irrigation and make-up water pump stations with long annual working hours, pumps with wide range, high efficiency and good cavitation performance shall be selected. For those pumping stations focusing on drainage, the pump type with reliable working performance and simple structure shall be selected. (4) The project layout shall adopt positive water inflow as far as possible to ensure that the water inflow condition of each unit is good and the flow pattern is uniform. recommend Boosting and stabilizing integrated pump set When lateral water inflow has to be adopted in the project layout, the distance between the lateral water inlet and the pump shall be extended as far as possible in the design, and certain diversion measures shall be taken. (5) The design of the outlet pool should try to avoid sharp bends that cause water impact and backwater. The pressure water tank shall be designed to avoid the increase of energy loss due to the mutual impact of water flow in each outlet pipe. (6) The construction materials available locally shall be used as far as possible. The design shall ensure simple and convenient construction and less project investment.
Boosting and stabilizing integrated pump set manufactor This paper introduces the advantages of the assembled steel structure building: 1. Standardization: standardization is the basis of modular construction. The standardization of module geometric size, connection mode, module combination form, internal parts, equipment and facilities is the basic guarantee to realize rapid and high-quality construction. 2. Modularization: all functional spaces are composed of modules with a high degree of standardization, which fully reflects the speed advantages brought by standardization and integration and meets the needs of emergency medical facilities construction. 3. Industrialization: the construction will be completed in a short time, and the designer will make full use of the existing module product size. While processing the floor on site, modules are produced synchronously in the factory. The factory environment and indoor construction conditions will ensure that its quality is easier to control and improve, defects are reduced, product reliability is improved, and production efficiency is high. 4. Assembling: the construction period on site is very short. In addition to wet operations such as floor leveling and foundation treatment, other parts of the site, such as equipment pipeline installation, door and window installation, indoor facilities installation, etc., are completely dry construction. Different types of work cross each other. Compared with traditional construction methods, it saves time, recommend Boosting and stabilizing integrated pump set Construction and decoration waste will also be reduced by about 70%.
recommend Boosting and stabilizing integrated pump set Talking about why the country should vigorously promote smart water, Boosting and stabilizing integrated pump set manufactor How to build a smart pump house? The four ministries and commissions of the country put forward safeguard measures and requirements on improving and improving the construction and management of secondary water supply infrastructure for urban residents to ensure water quality safety, requiring that the construction and management of secondary water supply infrastructure should be improved and improved in all aspects to ensure the scientific planning and construction of secondary water supply infrastructure and promote the systematic operation and maintenance of secondary water supply infrastructure. Promote the formation of a new pattern of secondary water supply infrastructure construction and management with clear rights and responsibilities, professional management and adequate supervision, and solve the water quality safety problem of "one kilometer after the urban water supply".
recommend Boosting and stabilizing integrated pump set As the underground installation is adopted, it can be directly installed around the residential area, and because of its small floor area, the characteristics of the whole underground installation will not affect the lives of residents. The harmony and unity with the surrounding environment can be achieved through the landscape control room above the ground. Boosting and stabilizing integrated pump set manufactor It is used in places that cannot rely on gravity to discharge sewage by itself. Waste water below the water level of the waterway is collected through the sewage tank, as well as waste water discharged far away from the municipal sewage pipe network and sanitary facilities, and sewage is transported to the sewage pipe network with the help of the sewage pump.
1、 Boosting and stabilizing integrated pump set manufactor Location selection. recommend Boosting and stabilizing integrated pump set It is the core part of the water supply and fire fighting pipe network of the whole building or the whole community, the plant area. The location of the pump room should be selected not only to facilitate the laying of water supply and fire fighting pipe network, but also not to have noise impact on rooms with quiet requirements. It should also try to minimize the occupancy of valuable buildings (such as shops and parking spaces). The domestic water supply pump room and fire pump room should be built together, which can not only save land, but also facilitate maintenance management. For a residential area, the pump room is often designed in the equipment room of the underground garage, and is combined with the generator room and other electrical and air-conditioning rooms in the same fire compartment. And the pump room should be as close as possible to the middle of the large water users or the whole community, which can reduce the length of the main pipe and reduce the head loss of the pipe network. The outlet of the pump room shall be directly connected to the outdoor or the emergency exit. If the pump house is located in a civil building, it should not be adjacent to the neighbor's house or on its upper or lower floors, and the pump house should be located in a well ventilated room without freezing. The size of the pump room is determined by the layout of the living pool, fire pool and pump set.